Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: REVISION - - 1ST
Permit Number - T05CM03034
Review Name: REVISION - - 1ST
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/02/2007 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Revise the provided water calculations, using the required static lift (19 feet) as required by Section A 1.1, UPC 1994. 2. Third request. Coordinate drawings P-3, P-4, and P-5 for the hot water piping to EF-2. Drawings P-3 and P-4 show 1-1/2" from WH-2 to EF-2 but drawing P-5 shows 1", 1-1/4", and 1-1/2" piping from WH-2 to EF-2. Also, detail 4/P-5 shows the booster pump being attached to WH-1, not WH-2. 3. Third request. Confirm the required drainage points for EF-2. Coordinate drawings P-2, P-4, and P-5 for the drains from EF-2. Drawing P-2 indicates 2 drains from EF-2 but drawings P-4 and P-5 show only one drain from EF-2. 4. Clarify the piping arrangement of the control box for EF-2. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
03/29/2007 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |
03/29/2007 | SUE REEVES | REJECT SHELF | Completed |