Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: REVISION - - 1ST
Permit Number - T05CM03034
Review Name: REVISION - - 1ST
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/02/2007 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Revise the provided water calculations, using the required static lift (19 feet) as required by Section A 1.1, UPC 1994. 2. Second request. Coordinate drawings P-3, P-4, and P-5 for the hot water piping to EF-2. 3. Second request. Confirm the required drainage points for EF-2. Coordinate drawings P-2, P-4, and P-5 for the drains from EF-2. 4. Clarify the location and piping arrangement of the control box for EF-2. 5. Provide calculations to show that the booster pump will provide 60 PSI at EF-2. |
02/07/2007 | LEERAY HANLY | BUILDING-COMMERCIAL | REVIEW | Approved | APPROVED PER ORIGINAL DETAIL DRAWINGS WITH LOAD PATH THROUGH WALL UNDER PLATFORM. CONFIRMED WITH FIELD STRUCTURAL OBSERVATION BY L HANLY AND CONVERSATION WITH EOR ON 2-7-07 |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
02/21/2007 | FSANCHE1 | OUT TO CUSTOMER | Completed |
02/21/2007 | SUE REEVES | REJECT SHELF | Completed |