Permit Review Detail
Review Status: Completed
Review Details: REVISION - - 1ST
Permit Number - T05CM03034
Review Name: REVISION - - 1ST
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/06/2006 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Revise the provided water calculations, using the available minimum pressure (75 PSI) and the required static lift (19 feet) as required by Sections A 1.1 and A 3.2, UPC 1994. The pipe friction loss due to the developed length of pipe from the meter to EF-2 is appropriate, not the pipe friction loss from the water heater to EF-2 (Section A 3.4, UPC 1994). 2. Coordinate drawings P-3, P-4, and P-5 for the hot water piping to EF-2. 3. The building reviewer will review the provided structural calculations. 4. Confirm the required drainage points for EF-2. Coordinate drawings P-2, P-4, and P-5 for the drains from EF-2. |
12/12/2006 | CHRISTY FOREMAN | BUILDING-COMMERCIAL | REVIEW | Denied | 1) Submit approved permit set when submitting a revision so reviewer can clarify revision changes and how they would effect approved drawings. 2) Provide new roof framing plan and details. Clarify loads for new equipment. Clarify load path for new loads.Specify framing items per structural calculations provided 11/13/06 and justify existing loads used. Specify all connections and platform to carry new equipment. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
12/13/2006 | BETH GRANT | OUT TO CUSTOMER | Completed |
12/13/2006 | SUE REEVES | REJECT SHELF | Completed |