Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: REVISION - - 1ST
Permit Number - T05CM03034
Review Name: REVISION - - 1ST
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/12/2006 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The specifications for the booster pump, P2, have changed from the approved drawings. Provide calculations and data to show that the new pump is capable of providing 6PSI water to EF-2. Reference Section 103.2.3, UPC 1994. 2. Provide structural calculations to show that the roof structure can support the addition of WH-2 (1340 Lb.). Reference Section 101.5.1, UPC 1994. 3. Provide a drip pan and drain for WH-2. Reference Section 510.7, UPC 1994. 4. Provide rain protection (i.e. a roof) for the indirect waste receptor located on the roof. Reference Sections 714.2 and D1.1(a), UPC 1994. 5. Confirm the required drainage points for EF-2. The approved plans show two 3" drains and a 1" drain but the revised plans show only two 3" drains. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
10/25/2006 | CINDY AGUILAR | APPROVAL SHELF | Completed |
10/25/2006 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |