Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T05CM03002
Parcel: 12809006B

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T05CM03002
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/22/2005 JOSE ORTIZ ENGINEERING REVIEW Approved
06/22/2005 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Revise the size of the water piping based on the provided pressure calculations.
2. Show that the amount of oxygen being stored is less than the allowable quantity.
3. Provide oxygen piping per level 3, NFPA 99 (1996) requirements.
06/22/2005 ROBERT SHERRY WATER REVIEW Approved
06/22/2005 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied Provide calculations for common ventilation for Unit 1114B per Section 403.3.2, IMC 2000.
06/28/2005 CHRISTY FOREMAN BUILDING-COMMERCIAL REVIEW Denied 1) IF NON-SEPARATED USE JUSTIFY BLDG SQ. FOOTAGE PER MOST RESTRICTIVE USE IN BLDG. CANDY STORE = A2.
2) CLARIFY / JUSTIFY QUANTITY OF PLUMBING FIXTURES PER OCCUPANT LOAD OF ALL TENANTS USING THE FACILITIES. MENS AND WOMENS FACILITIES REQUIRED PER OCCUPANT LOAD. 20% COST OF CONSTRUCTION NEEDS TO BE SPENT TOWARDS MEETING ACCESSIBILITY. ANSI A117.1 2003.
06/28/2005 JMORALE1 WWM REVIEW Needs Review
06/28/2005 TERRY STEVENS ZONING REVIEW Approved
06/28/2005 LINDA BUCZYNSKI ELECTRICAL-COMMERCIAL REVIEW Denied T05CM03002 6/28/05

1. Minimum font size 10 point.
2. Please change the notation on the Power Plan "B-23-23" to read "B-23,25."
3. Provide power for new Water Heater per Sheet P1.1.
4. New AC is 1-phase on Sheet M1.1. Has 3-phase power on Electrical. Coordinate with Mechanical and clarify.
06/28/2005 JMORALE1 FIRE REVIEW Needs Review