Permit Number: T05CM02939
Parcel: Unknown

Review Status: Active

Review Details: POST 3RD PARTY REVIEW

Permit Number - T05CM02939
Review Name: POST 3RD PARTY REVIEW
Review Status: Active
Review Date Reviewer's Name Type of Review Description Status Comments
02/01/2006 ANDREW CONNOR NPPO REVIEW Passed
02/03/2006 MBROWN3 FIRE REVIEW Approved
02/08/2006 GERRY KOZIOL WWM REVIEW Denied 1:need to build public sewer-needs hold harmless letter from wastewater/DSD/2nd floor.
2:need to know if 1st floor bedroom #4 bath is selected(add 8fu's) need to know if this a unit with an elevator (minus 3rd floor shower & lav deduct 3 fu's).
02/14/2006 PATRICIA GILBERT ENGINEERING REVIEW Denied DATE: February 14, 2006
ACTIVITY NUMBER: T05CM02939
PROJECT NAME: Riverwalk
PROJECT ADDRESS: 2428 E. Emerald Moon Drive
PROJECT REVIEWER: Patricia Gilbert


RESUBMITTAL REQUIRED: SITE PLAN

1. General note number 36 on the Tentative Plat/Development Plan reads as follows, "Any Improvement Permits prior to the completion of the Pima County Flood Control District Drainage Improvements is subject to the City of Tucson Floodplain regulations and will require a floodplain use permit and a hydrology report." Because the drainage improvements are not complete a floodplain use permit and hydrology report must be submitted with each building permit submittal (building application and plans). Once the Pima County drainage improvements are complete the subject property will not be subject to City of Tucson Code Chapter 26 Floodplain Erosion Hazard Management. Please contact Patricia Gilbert at 791-5550 ext. 2206 or Jose Ortiz ext. 1191, for any questions or concerns.
02/17/2006 ROBERT SHERRY WATER REVIEW Approved Provide backflow protection after the water meter per COT Ordinance 9976, effective 7/1/2004.
02/26/2006 DAVID RIVERA ZONING REVIEW Denied 02/26/06

Development Services Department
Zoning Review Section

David Rivera
Principal Planner

Comments:


1. Zoning cannot approve the plans until Engineering Comments have been addressed.

Zoning will re-review and approve the building plans once Engineering has given approval.

2. Add the specific lot number to each permit card. Zoning must verify the lot to be developed with the new SFR will be in compliance with the approved tentative plat.

3. Two copies of a plot plan specific to the lots to be developed must accompany the permit applications. Additional information may be required on the plot plans if permits are for two attached units. This cannot be verified until zoning is sure of the lot nujmber and sees the plot plans. Please ensure that the requested information is provided with the next submittal.

Please call me if you have any questions related to the zoning comments.