Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T05CM02884
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/05/2005 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. The area used to calculate the ventilation for room 105 (AC-3) does not agree with the dimensioned architectural plans. Revise the ventilation calculations demonstrating as required. Reference Section 403.3, IMC 2000. 2. The owner is paying for power to be installed for a range in the snack bar (Circuits 12 and 14, Panel S). It is therefore a valid assumption that a range is planned for that area. A Type 1 hood will be required for that range. |
10/06/2005 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Comment not addressed. Increase the size of the overflow in the roof drain collector box to equal the size of the scupper. Reference Section D1.1 (d), UPC 1994. 2. Correct the arithmetic for the total water fixture units and recalculate the total demand. Correct the arithmetic for the allowable pressure loss per 100 feet in the water calculation. Revise the pipe sizes if required. Reference Section 610.1, UPC 1994. 3. A 3" trap (P9B) has 6 waste fixture units. Reference Section 702.0 and Footnote, Table 7-3, UPC 1994. 4. The fixture connection sizes called out for the flush valves will result in water velocities greater than 8 FPS. Limit the water velocity to less than 8 FPS for the copper piping. Reference Section A 6.1, UPC 1994 and IAPMO IS 3-93, Section 610.0. 5. Coordinate the mechanical and plumbing equipment requirements with the electrical designs (e.g. EC-1 is not a 3/4HP pump and only there is one water heater, not two). Include the specifics of RCP-1 on the drawing. |
10/14/2005 | RAUL PALMA | BUILDING-COMMERCIAL | REVIEW | Approv-Cond | |
10/17/2005 | GERRY KOZIOL | WWM | REVIEW | Denied | needs 8th floor credit evaluation |
10/19/2005 | BOB SUBA | ELECTRICAL-COMMERCIAL | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
10/25/2005 | KMEDINA1 | OUT TO CUSTOMER | Completed |