Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T05CM02790
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/30/2005 | TERRY STEVENS | ZONING | REVIEW | Needs Review | |
09/30/2005 | KMEDINA1 | WWM | REVIEW | Needs Review | |
09/30/2005 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
09/30/2005 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T05CM02790 9/30/05 Plans changed in scope of work before permit issued. Needs completely new review. 1. N/A. 2. Provide panel and circuit number for all new electrical loads. 3. Plot location of electrical panel on plans. 4. Provide panel schedule, with load calculations. 5. Provide disconnect for new Water Heater per NEC 422 Part III. |
09/30/2005 | PATRICIA GILBERT | ENGINEERING | REVIEW | Needs Review | |
09/30/2005 | RAUL PALMA | BUILDING-COMMERCIAL | REVIEW | Approved | |
09/30/2005 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Approved | 1. Show how the water lines to the new restroom were sized. Provide water pressure calculations and show that the ¾" pipes to the water heater will be able to handle the new load. 2. The upper terminal cleanout for the water closet needs to be sized per Section 707.11, UPC 1994. 3. Provide an additional cleanout for the building sewer from the new restroom due to the aggregate horizontal change of direction of over 135 degrees. Reference Section 719.1, UPC 1994. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
09/30/2005 | KMEDINA1 | OUT TO CUSTOMER | Completed |