Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T05CM02761
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/16/2005 | JIM EGAN | FIRE | REVIEW | Approved | |
| 06/16/2005 | RAUL PALMA | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 06/16/2005 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
| 06/16/2005 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T05CM02761 6/16/05 1. Sheet E-2 could not find Keynote 11 on plans. 2. Sheet E-2 there is a dosconnect with no panel/circuit designation, upper right. 3. Keynote 3 Sheet E-2 does not appear to apply to new W/D. Also, add panel and ckt # for this new load. 4. Provide panel and circuit number for new sink receptacle(s). 5. Minimum font size 1/8". 6. Add 25% for largest motor on Panel B load tabulation. 7. 17A on Panel B (schedule) is incorrect. Revise, and carry through to service load calculations. 8. If Panel B is on a 150A feeder, that feeder would not be protected by a 200A OCPD. 9. If Panel B is on a 150A feeder, it would not be sufficient for the load. Second review 6/16/95 still needed corrections #1,2, & 6 above. |
| 06/16/2005 | PATRICIA GILBERT | ENGINEERING | REVIEW | Approved | |
| 06/20/2005 | GBONILL1 | PLUMBING-COMMERCIAL | REVIEW | Needs Review | |
| 06/20/2005 | GBONILL1 | WWM | REVIEW | Needs Review | |
| 06/20/2005 | GBONILL1 | MECHANICAL-COMMERCIAL | REVIEW | Needs Review | |
| 06/20/2005 | GBONILL1 | WATER | REVIEW | Needs Review |