| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/11/2005 | JIM EGAN | FIRE | REVIEW | Approved | |
| 08/11/2005 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide site drawing showing the size and route of the building water supply along with the location and size of both the water meter and the reduced pressure backflow preventer assembly. Reference Section 103.2.3, UPC 1994. 2. Provide site drawing showing the size, route, and termination of the building sewer. Reference Section 103.2.3, UPC 1994. 3. Provide the minimum plumbing facilities (e.g. drinking fountain) required by Table 2902.1, IBC 2003, for business occupancy. 4. Provide cut sheets for the water meter and the reduced pressure backflow preventer showing their respective pressure drops at the projected demand. Reference Section 610.2, UPC 1994. 5. Confirm the developed length for the water piping. Revise the water calculations as required. |
| 08/11/2005 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 08/11/2005 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide energy code compliance calculations for the addition. Reference Section 101.3, International Energy Conservation Code 2000. 2. Provide information on the sequence of operation for the restroom exhaust to show that recirculation of the air from the restroom will not occur. Reference Section 403.2.1, IMC 2000. 3. Clarify the outside air requirements for AC-1 as shown on Compliance Schedule (i.e. 175 CFM or 400 CFM). |
| 08/19/2005 | PATRICIA GILBERT | ENGINEERING | REVIEW | Approved | |
| 08/31/2005 | GERRY KOZIOL | WWM | REVIEW | Denied | needs 8th floor credit evaluation & 5th floor par/non-par evaluation. |
| 09/07/2005 | RAUL PALMA | BUILDING-COMMERCIAL | REVIEW | Denied | 1) Sheet P-1, design anchors for waterheater. Provide engineering calcs for the anchors. |
| 09/09/2005 | DAN CASTRO | ZONING | REVIEW | Denied | Zoning Review may not approve the building plans prior to stuructural review approval. |
| 10/17/2005 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Approved | TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1106 OR EMAIL AT Linda.Buczynski@tucsonaz.gov IF YOU CARE TO DISCUSS. 1. Please modify the 70/2 CB on Panel A to "70/3." 2. According to Sheet P-1 the WH is 2.0 KW, not 2.4KW, which would require a smaller OCPD, 25A, not 30A. Coordinate with Plumbing and clarify. 3. It is unclear which lighting fixtures are to go on Ckt 23, and which go on Ckt 25. This run appears twice on the plans, and one of them could be intended for Ckt 27. 4. It appears that the Grounding Electrode Conductor should be #4, not #6. 5. If the existing service is overhead, please indicate such on the plans. If this is not the case, provide an underground service. 6. This is not a Code issue, but please note that full cutoff lighting fixtures installed under canopies shall not be counted in determining total light output. Reference Tucson Lighting Code 5.1.2. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 09/09/2005 | JMORALE1 | OUT TO CUSTOMER | Completed |