Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T05CM02521
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/29/2005 | NEAL SAUNDERS | BUILDING-RESIDENTIAL | REVIEW | Denied | 1. Provide self-closing door from the dwelling to the garage. 2. locate details 221 and 236. 3. "2x6 overbuild" note is still present. 4. 7/S.3 - Note pressure treated plate, minimum anchor bolt embedment (7") and wall framing (stud size and spacing). 5. Detail or specify beam to beam connection (FB1 to FB3). 6. Detail or specify stringer to foundation and stringer to header (@ 2nd story) connection. Specify stair header at appropriate location. FB4 is shown above first story entrance to stairs rather than @ top of stairs where stringers connect to second story. 7. Provide an isometric drawing of waste lines. Required to show that there is no wet venting between stories. 8. Is return air for second story unit at the right location in the bedroom? Also, this duct is undersized for 3 ton unit. 8. Return air ducts shall be sized per IRC sections M1602.2. (gas furnace - 2 sq. in. / 1000 BTU; heat pump / air conditioner - 6 sq. in. / 1000 BTU) (1ton cooling = 12,000 BTU). 9. AC #1 and AC #2 require 220 volt power (i.e two spaces in panel) at the condenser disconnect (outside) and the air handler location (closets). These particular models (RBHC17J06SFD) requires 60 amp for heating element at Air handler/coil location. Provide 10. Provide two copies of approved (zoning and engineering) site plan and a second copy of engineering calcs. ANY QUESTIONS CONTACT NEIL SAUNDERS @ 791-5550 x1113 |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 08/03/2005 | KMEDINA1 | OUT TO CUSTOMER | Completed |