Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T05CM02090
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/12/2005 | JIM EGAN | FIRE | REVIEW | Approved | |
05/12/2005 | SREEVES1 | WWM | REVIEW | Passed | no plbg on plans |
06/01/2005 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
06/01/2005 | ROBERT SHERRY | WATER | REVIEW | Approved | |
06/01/2005 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
06/06/2005 | CHRISTY FOREMAN | BUILDING-COMMERCIAL | REVIEW | Approved | |
06/06/2005 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1106 OR EMAIL AT Linda.Buczynski@tucsonaz.gov IF YOU CARE TO DISCUSS. 1. Indicate number of poles and fault current rating of ATS. Note that Specifications 16250-3 1.04 B 6 and 7 call for 4-pole transfer switches to have a switched neutral pole, but 3-pole switches to have a neutral bus and lugs. Generator is grounded and bonded as for a Separately Derived System. 2. Provide AFC at ATS. Specifications 16250-2 1.04 A 4 call for transfer switch equipment to withstand the AFC shown on the drawings. 3. The GND in the conduit between the CT Can and new service disconnect consists of a redundant path. 4. Please provide the size of the Grounding Electrode conductor at the new service disconnect. 5. Please provide a panel schedule for new Panel "EMR". |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
06/15/2005 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |
06/15/2005 | SUE REEVES | REJECT SHELF | Completed |