Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T05CM02056
Review Name: COMMERCIAL NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/12/2005 | JIM EGAN | FIRE | REVIEW | Denied | Provide complete fire sprinkler system design criteria on plan 1. Design Standard to be used. 2. Hazard classifications 3. Minimum design densities and areas of operation. 4. Water Supply information Static__Psi Residual__psi Flow__gpm. |
| 08/12/2005 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 08/12/2005 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide plans sealed by an Arizona Registrant. Reference Arizona Revised Statutes 32-125, Board of Technical Registration Rules, R4-30-304. 2. Provide energy code compliance calculations. Reference Section 101.3, International Energy Conservation Code 2000. 3. The minimum insulation for ducts located in unconditioned spaces within the building envelope is R-5. Reference Section 803.2.8, IECC 2000. 4. The minimum insulation for ducts located outside of the building envelope is R-8. Reference Section 803.2.8, IECC 2000. 5. Provide structural calculations to verify that the existing roof is capable of supporting the additional dead load due to the installation of the roof top units. Reference Section 302.1, IMC 2000. 6. Show the size, routing, and termination of the condensate drains. Reference Section 307.2, IMC 2000 and Section 807.2, UPC 1994. (Note: the condensate drains may terminate at the tailpiece of a lavatory but may not terminate at the tailpiece of a sink.) 7. Provide calculations demonstrating adequate ventilation. Reference Sections 401and 403, IMC 2000. 8. Materials exposed in plenums shall conform to Section 602.2.1, IMC. 9. Provide listed and labeled fire dampers for protection of ducts and penetrations of fire resistive walls. (See rooms 135 and 137) Reference Sections 607.3, and 607.5.2, IMC. 10. Provide information to show that the elevator machine room does not require an independent venting or air conditioning system to prevent overheating of the elevator equipment. Reference Section 3006, IBC 2003. |
| 08/15/2005 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide plans sealed by an Arizona Registrant. Reference Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304. 2. Provide site drawing showing the size and route of the building water supply along with the location and size of both the water meter and the reduced pressure backflow preventer assembly. Reference Section 103.2.3, UPC 1994. 3. Provide water supply isometrics. Reference Section 103.2.3, UPC 1994. 4. Provide water pressure and water pipe sizing calculations. Reference Appendix A, UPC 1994. 5. Verify the size of the RPBP located after the meter complies to Section 610.2, UPC 1994. 6. Coordinate the plumbing fixture layout (sheet P-2.0) with the fixtures shown on sheet A-2.1. Reference Section 103.2.3, UPC 1994. 7. Provide site drawing showing the size, route, and slope of the building sewer. Reference Section 103.2.3, UPC 1994. 8. Provide waste and vent isometrics. Reference Section 103.2.3, UPC 1994. 9. Provide a schedule of waste fixture units for all plumbing fixtures using the values shown in table 7-3, UPC 1994. Include the total number of each fixture being installed. Reference Section 703.1, UPC 1994. 10. The design for the trench drains shows a running trap (i.e. no vent) at the trench connection, no cleanouts for the waste lines (up to 192 feet long) and ends at the interceptor, which is also a trap. Show how this design complies with Chapters 7, 9, and 10, UPC 1994. 11. Provide a natural gas schematic showing the loads and developed lengths of the piping. Show the location of the gas meter along with the developed length from the meter to the building. If the Contractor decides to use medium pressure gas, a revision to the plans and the permit will be required. Reference Section 103.2.3, UPC 1994. 12. Provide calculations to show how the roof drains and horizontal rainwater pipes were sized. Show the slope of the horizontal rainwater pipes on the plans. Reference Appendix D, UPC 1994. 13. Coordinate the roof drainage design (sheet P-2.1) with the roof plan shown on sheet A-12.1. Reference Section 103.2.3, UPC 1994. 14. Provide a design for the drainage of the roof located north of column line 7. Reference Section 103.2.3, UPC 1994. 15. Clarify the design of the roof drain for the entry element shown on sheet A-15.1. Reference Section 103.2.3, UPC 1994. |
| 08/24/2005 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | May not submit plans unless they are sealed by an Electrical Engineer Registered in the State of Arizona. |
| 08/30/2005 | GERRY KOZIOL | WWM | REVIEW | Denied | needs to show location/method of connection to public sewer. needs ww/iwc review & approval. (Tom Tomchak 579-5771) needs WW 8th floor credit evaluation for bldg demo. |
| 09/01/2005 | PATRICIA GILBERT | ENGINEERING | REVIEW | Denied | Approved site plan required. |
| 09/08/2005 | SREEVES1 | ZONING | REVIEW | Needs Review | |
| 09/08/2005 | SREEVES1 | BUILDING-COMMERCIAL | REVIEW | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 09/08/2005 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |