Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T05CM02056
Parcel: 12814136A

Address:
5163 E 22ND ST

Review Status: Completed

Review Details: COMMERCIAL NEW

Permit Number - T05CM02056
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/12/2005 JIM EGAN FIRE REVIEW Denied Provide complete fire sprinkler system design criteria on plan
1. Design Standard to be used.
2. Hazard classifications
3. Minimum design densities and areas of operation.
4. Water Supply information Static__Psi Residual__psi
Flow__gpm.
08/12/2005 ROBERT SHERRY WATER REVIEW Approved
08/12/2005 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Provide plans sealed by an Arizona Registrant. Reference Arizona Revised Statutes 32-125, Board of Technical Registration Rules, R4-30-304.
2. Provide energy code compliance calculations. Reference Section 101.3, International Energy Conservation Code 2000.
3. The minimum insulation for ducts located in unconditioned spaces within the building envelope is R-5. Reference Section 803.2.8, IECC 2000.
4. The minimum insulation for ducts located outside of the building envelope is R-8. Reference Section 803.2.8, IECC 2000.
5. Provide structural calculations to verify that the existing roof is capable of supporting the additional dead load due to the installation of the roof top units. Reference Section 302.1, IMC 2000.
6. Show the size, routing, and termination of the condensate drains. Reference Section 307.2, IMC 2000 and Section 807.2, UPC 1994. (Note: the condensate drains may terminate at the tailpiece of a lavatory but may not terminate at the tailpiece of a sink.)
7. Provide calculations demonstrating adequate ventilation. Reference Sections 401and 403, IMC 2000.
8. Materials exposed in plenums shall conform to Section 602.2.1, IMC.

9. Provide listed and labeled fire dampers for protection of ducts and penetrations of fire resistive walls. (See rooms 135 and 137) Reference Sections 607.3, and 607.5.2, IMC.
10. Provide information to show that the elevator machine room does not require an independent venting or air conditioning system to prevent overheating of the elevator equipment. Reference Section 3006, IBC 2003.
08/15/2005 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Provide plans sealed by an Arizona Registrant. Reference Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304.
2. Provide site drawing showing the size and route of the building water supply along with the location and size of both the water meter and the reduced pressure backflow preventer assembly. Reference Section 103.2.3, UPC 1994.
3. Provide water supply isometrics. Reference Section 103.2.3, UPC 1994.
4. Provide water pressure and water pipe sizing calculations. Reference Appendix A, UPC 1994.
5. Verify the size of the RPBP located after the meter complies to Section 610.2, UPC 1994.
6. Coordinate the plumbing fixture layout (sheet P-2.0) with the fixtures shown on sheet A-2.1. Reference Section 103.2.3, UPC 1994.
7. Provide site drawing showing the size, route, and slope of the building sewer. Reference Section 103.2.3, UPC 1994.
8. Provide waste and vent isometrics. Reference Section 103.2.3, UPC 1994.
9. Provide a schedule of waste fixture units for all plumbing fixtures using the values shown in table 7-3, UPC 1994. Include the total number of each fixture being installed. Reference Section 703.1, UPC 1994.
10. The design for the trench drains shows a running trap (i.e. no vent) at the trench connection, no cleanouts for the waste lines (up to 192 feet long) and ends at the interceptor, which is also a trap. Show how this design complies with Chapters 7, 9, and 10, UPC 1994.
11. Provide a natural gas schematic showing the loads and developed lengths of the piping. Show the location of the gas meter along with the developed length from the meter to the building. If the Contractor decides to use medium pressure gas, a revision to the plans and the permit will be required. Reference Section 103.2.3, UPC 1994.
12. Provide calculations to show how the roof drains and horizontal rainwater pipes were sized. Show the slope of the horizontal rainwater pipes on the plans. Reference Appendix D, UPC 1994.
13. Coordinate the roof drainage design (sheet P-2.1) with the roof plan shown on sheet A-12.1. Reference Section 103.2.3, UPC 1994.
14. Provide a design for the drainage of the roof located north of column line 7. Reference Section 103.2.3, UPC 1994.
15. Clarify the design of the roof drain for the entry element shown on sheet A-15.1. Reference Section 103.2.3, UPC 1994.
08/24/2005 LINDA BUCZYNSKI ELECTRICAL-COMMERCIAL REVIEW Denied May not submit plans unless they are sealed by an Electrical Engineer Registered in the State of Arizona.
08/30/2005 GERRY KOZIOL WWM REVIEW Denied needs to show location/method of connection to public sewer. needs ww/iwc review & approval. (Tom Tomchak 579-5771) needs WW 8th floor credit evaluation for bldg demo.
09/01/2005 PATRICIA GILBERT ENGINEERING REVIEW Denied Approved site plan required.
09/08/2005 SREEVES1 ZONING REVIEW Needs Review
09/08/2005 SREEVES1 BUILDING-COMMERCIAL REVIEW Needs Review

Final Status

Task End Date Reviewer's Name Type of Review Description
09/08/2005 CINDY AGUILAR OUT TO CUSTOMER Completed