Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T05CM02015
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/12/2005 | JIM EGAN | FIRE | REVIEW | Approved | |
05/12/2005 | SREEVES1 | WWM | REVIEW | Passed | no plbg on plans |
06/01/2005 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
06/01/2005 | ROBERT SHERRY | WATER | REVIEW | Approved | |
06/01/2005 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
06/06/2005 | CHRISTY FOREMAN | BUILDING-COMMERCIAL | REVIEW | Approved | |
06/06/2005 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1106 OR EMAIL AT Linda.Buczynski@tucsonaz.gov IF YOU CARE TO DISCUSS. 1. Minimum font size is 1/8". Please enlarge as necessary. 2. Regarding the feeders from T1 to EDP, please clarify why 2-250 KCMIL will be spliced to 2-4/0 phase and 2-#2 N. 3. Please clarify how ATS-1, which is single phase per Keynote 16 on Sheet TE1.2, is to have 4-350 KCMIL at both sides of its terminals. 4. Indicate number of poles and fault current rating of both ATS switches. Note that Specifications 16250-3 1.04 B 6 and 7 call for 4-pole transfer switches to have a switched neutral pole, but 3-pole switches to have a neutral bus and lugs. Generator is grounded and bonded as for a Separately Derived System. 5. Provide AFC at both switches. Specifications 16250-2 1.04 A 4 call for transfer switch equipment to withstand the AFC shown on the drawings. 6. Could not find Keynote 1 on Sheet TE1.2. 7. Please clarify the intent of the load shedding arrangement, Specifications 16250-6 1.05 B 6. 8. From the way the line diagram is configured, it appears that the service disconnect is at DS-1. Please clarify why the two new 600A disconnect switches need to be service entrance rated. 9. The portion of the ATS-1 feeder between DS-1 and the fused disconnect has a 1/0 GND. This shall be 4/0 per NEC Table 250.122. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
06/15/2005 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |
06/15/2005 | SUE REEVES | REJECT SHELF | Completed |