Permit Review Detail
Review Status: Completed
Review Details: RESIDENTIAL BLDG/WWM
Permit Number - T05CM01932
Review Name: RESIDENTIAL BLDG/WWM
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/25/2005 | NEAL SAUNDERS | BUILDING-RESIDENTIAL | REVIEW | Denied | Plan Check Comments - Project T05cm01932 Plan Review for the above referenced structure has been completed. This letter reflects comments to be addressed. In order to facilitate a shorter back check time, we request that you please provide revised plans and calculations, highlighting any changes, along with a written response to each of the noted items indicating action taken. General Requirements 1. All corrections and revisions shall be made on the original tracings and two new sets of prints or (1) sepia and (1) blue line shall be returned. 2. Pencil corrections on final prints will not be acceptable. To avoid delays ensure that corrections have been made, are complete and have been coordinated on all-applicable details and notes. Site Plan 1. Dimension from side property line to new carport. Floor Plan 1. Show locations of skylights (dashed lines) on floor plan. Provide ICBO # on all skylights over 2' by 4' Foundation Plan 1. Note on the drawings the allowable soil bearing pressure used in the design of the footings, or state that the assumed value of 1500 PSF is being used per table R401.4.1. 2. Detail A - Dimension 12" into natural grade and 6" from grade to bottom of post. 3. Detail B - Specify type of post base. Structural Plan 1. Locate and identify brace wall types and locations along with the appropriate nailing schedule. Note the minimum width of 4' or 2'-8" (with tiedowns). A Panel Detail suggests that two of the panels have tiedowns, which means that they could be 2'-8". Clarify width of each panel. Callout sheathing on detail A, page 3. Note thickness of sheathing and nailing schedule. 2. Specify design criteria on plans. Provide values for roof dead load and live load. 3. Specify lumber grade and species. 4. Specify and detail all over-framing. If solid sheathing is used on the lower trusses, provide minimum openings of 22" by 30" for access and ventilation into over-framed areas (>30 S.F.). If solid sheathing is not used on lower trusses, provide details for bracing of top chord of lower trusses. 5. Note and detail tie straps, framing anchors and joist hangers by type, size and required attachment to framing members. - Post to ridge beam caps and rafter to ridge beam hangers. 6. Note and specify a complete roofing system: Roofing type, grade of materials and method of installation per R905. 7. Note and specify all roof slopes appropriate to material. (minimum allowable roof slope is ΒΌ" per foot per R905.11.1). 8. Show calculation of attic ventilation area in compliance with R806.2. Note location of all vents needed to comply. Not necessary if rafters are completely filled with insulation. R-19 will fill a 2x6 space. 9. Specify Rafter to ridge beam connection. 10. New roof slopes look low (<3:12) therefore roof construction is considered post and beam. Ridge beams are to be modeled as beams per R802.3. Both (2) 2x6 ridge beams are inadequate for spans and tributary widths. Resize. Also a post must support each end of the beam. Provide and show the location of these posts. Include connection of post to beam. 11. 6x8 is inadequate to support existing load of house and point load from (2) 2x6 ridge beam. Resize or justify. 12. Clarify opening in master bedroom. New or existing? Locate with dimensions on floor plan. Size existing header and/or lintel. 13. Specify infill construction. 14. Provide nailing pattern for roof sheathing. 15. Detail B does not match Detail 1-A in respect to beam connection. '2-1/2" x 4-1/2" lags each way' suggest that each beam is bearing on post while detail 1-A is shows one beam hanging from other via HUS48TF. Clarify. 16. Detail framing of interior partition wall (include connection to slab). Electrical and Mechanical Plan 1. Note on plans: Electrical work shall comply wit chapters 33-42 2003 IRC. 2. Note that light fixtures in clothes closets shall be installed in accordance with E3903.11. 3. Note on plans: Mechanical shall comply with 2003 IRC chapters 13 - 24. 4. Dwelling must be provided with heating capable of maintaining a room temperature of 68 degrees at a point 3' above the floor per R303.8. If you have any questions, please contact your assigned plans examiner Neil Saunders at 791-5550, extension 1113. NOTE: As of 09/06/04 the City of Tucson has adopted the 2003 IRC with the exception of the plumbing portion which has been replaced with the Arizona state plumbing code. All model plans shall reference these codes. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 06/01/2005 | KMEDINA1 | OUT TO CUSTOMER | Completed |