Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T05CM01925
Parcel: 11205283F

Review Status: Stopped

Review Details: COMMERCIAL TI

Permit Number - T05CM01925
Review Name: COMMERCIAL TI
Review Status: Stopped
Review Date Reviewer's Name Type of Review Description Status Comments
05/02/2005 JIM EGAN FIRE REVIEW Approved
05/02/2005 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Provide information to show the fixtures being provided by the owner meet the plumbing material standards (P2, P3, P4, and the foot spas).
2. Clarify the nature of sink P4.
3. Revise the water fixture unit calculations to match the drawings. Revise the pipe sizing as required.
05/02/2005 RAUL PALMA BUILDING-COMMERCIAL REVIEW Approved
05/02/2005 ANY WWM REVIEW Stopped
05/02/2005 PATRICIA GILBERT ENGINEERING REVIEW Approved
05/02/2005 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Approved
05/02/2005 LINDA BUCZYNSKI ELECTRICAL-COMMERCIAL REVIEW Denied T05CM01925 DENIED 5/2/05

1. Specify voltage requirements for new WHs, on Plumbing Schedule.
2. Ckt B-6 should be 3000VA, not 1500VA. Also put the "*" by the description.
3. Provide feeder size for new Panels A and B.
4. If the new disconnects are being provided with this project, specify overcurrent protective devices.
5. Provide available fault current.
6. Provide fault calculations.
7. If this building was constructed after 1994, provide IECC calculations.
05/02/2005 ROBERT SHERRY WATER REVIEW Approved
05/17/2005 MICHAEL ST. PAUL ZONING REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
05/02/2005 ANY APPROVAL SHELF Stopped
05/02/2005 ANY OUT TO CUSTOMER Stopped
05/02/2005 ANY REJECT SHELF Stopped