Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: OTHER
Permit Number - T05CM01719
Review Name: OTHER
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/19/2005 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide protection from mechanical damage for the chilled water piping and piping supports. Reference Section 303.4, IMC 2000. 2. Revise the pipe insulation to comply with the requirements of Section 803.3.7, IECC 2000. 3. Show how the pipe support shown in detail 102/M2 is capable of supporting the load and accomodating any pipe movement. Show how the detailed attachment of the pipe support in asphalt paving will work. Reference Section 305.2, IMC 2000. |
04/19/2005 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T05CM01719 DENIED 4/19/05 1. Clearly identify location of MCC-1 on electrical plans. 2. Chiller Schedule Sheet M2 calls for MOCP 175. The 225A circuit breakers at the control panel and MCC-1 are above this maximum. 3. Demonstrate that the maintenance receptacle is not connected to the load side of the disconnecting means. Reference NEC 210.63. 4. On Single Line Diagram, Keynote 1 calls for 2 sets of 4-250 KCMIL, Keynote 5 calls for 3-3/0, and Keynote 6 calls for 3-#2. Panel Schedule calls for 4/0. Clarify new feeder size. |