Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - SITE ALL
Permit Number - T05CM01524
Review Name: RESUBMITTAL - SITE ALL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/26/2008 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 11/26/2008 | TERRY STEVENS | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Terry Stevens Lead Planner PROJECT: T05CM01524 2656 W. Broadway Blvd. Canyon Ridge Apartments Site Plan TRANSMITTAL: 11/25/2008 COMMENTS: Please resubmit revised drawings along with redlines and a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1 In the notes provide date of approval, case number and any required conditions of approval for the HDZ and WASH overlay review 2. Approval of the site plan cannot be completed until the HDZ and WASH overlay reviews have been approved. If you have any questions about this transmittal, please call Terry Stevens, (520) 791-5550 ext. 2000. TLS C:\planning\cdrc\DSC\T05CM01524-4.doc |
| 12/01/2008 | RONALD BROWN | ZONING HC SITE | REVIEW | Approved | |
| 12/03/2008 | ANDREW CONNOR | LANDSCAPE | REVIEW | Approved | |
| 12/03/2008 | JOE LINVILLE | NPPO | REVIEW | Approved | |
| 12/10/2008 | ELIZABETH EBERBACH | ENGINEERING | REVIEW | Approved | DATE: December 11, 2008 TO: Stantec SUBJECT: Canyon Ridge Grading Engineering 7th Submittal Review ACTIVITY NUMBERS: T05BU00798 / T05CM01524 / T05SA00404 LOCATION: T14S, R13E, Section 9 SUMMARY: Engineering Division has reviewed the grading plan resubmittal package. Approval is recommended for the grading plan, site plan, and floodplain use permit. A meeting to go over comments was held 25NOV08 with applicant, consultants, developer, and contractor, to go over remaining comments and proposed conditions of grading permit. GRADING PERMIT CONDITIONS: The following 39 conditions apply to grading permit T08BU00798: 1) If the approved disturbance area is not maintained, Stop Work Order, Revised Grading Plans review, and/or Overlay reviews may be required. 2) Control Points at base of walls shall be maintained for alternate retaining system options. 3) If the location of retaining walls change, or the runout for the retaining walls conflict with other improvements or exceed grading limits, a revised grading plan may be required. 4) BMP controls shall be placed parallel to contour elevations to prevent breakout of stormwater runoff along perimeter disturbance limits. 5) Stormwater controls shall not be placed outside of grading limits. 6) Any improvements or disturbance in the WASH Ordinance area, beyond those approved on the approved plans, including additional utility trenching, or further disturbance outside of approved limits, will require additional Floodplain Use Permit and Overlay review. 7) After construction activities are completed, contractor shall remove fine materials from bottom of basin area(s) and then scarify the basin bottom in order to remove any fines material build up caused by construction and to restore soil percolation. 8) For accessibility ramps, where slope is perpendicular to adjacent sidewalk, a minimum of 48-in of sidewalk is required at top of ramp. For example, at ramp south of Bldg #4. 9) Any subsurface engineering construction (i.e. toe-downs, cutoff walls, drainage pipes/structures, etc.) shall be accepted by Development Services Department Engineering Inspector prior to back filling. 10) Grouted riprap may need to be reconstructed, with thicker grout for the D50, or with other EOR recommendation, if the treatment fails inspections. 11) Erosion protection for runoff from wall openings shall be addressed provided, including erosion protection for stormwater runoff at base of retaining walls. 12) Splash pads, extended spillways, or other type of erosion protection shall be provided to reduce impact of concentrated flows at wall openings or ends of swales. 13) Spillway design/detail for outlet for CP1B shall be submitted prior to intermediate inspections. 14) Removable bollards are required at basin maintenance access entrance. 15) See Western Technologies Report and addenda. 16) All grades shall slope away from structures. Additional sidewalk scuppers may be needed during field inspections. 17) Call for DSD Engineering Inspection meetings. For a DSD Engineering Inspection, call IVR (740-6970), or schedule with a Customer Service Representative at the Development Services Department, or contact DSD Engineering at 837-4888, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html 18) See the associated Stormwater Pollution Prevention Plan as a part of this grading permit. Interim erosion and sediment controls shall be updated, revised, and maintained throughout the life of the project per approved grading plans and SWPPP at disturbance limits. Temporary erosion/stormwater controls may be field adjusted with discussions with operators and engineer of record as necessary, and shall be located within disturbance limits for this project. 19) A copy of the approved Grading Plans, SWPPP and Permits shall be kept at the site at all times, until final grading approval. 20) Heavy Duty Construction fence is required inside grading limits along Maxwell WASH side of the project. 21) The receiving waters for the SWPP is the Maxwell WASH. 22) For inspection purposes, post the "AZPDES - Posting Requirements" green sheet or NOI at construction entrances to the site at beginning of construction activities and maintain these posted documents throughout project construction. 23) Dust control methods such as water truck will be provided, as well as daily sweeping of the streets. 24) Designated concrete washout locations shall not be located adjacent to the WASH Ordinance or basin areas. 25) Temporary erosion control devices shall be placed at locations where stormwater runoff exits grading limits to prevent debris, construction silt, and/or chemicals from entering any drainage ways that eventually discharge into the receiving waters. 26) Engineer of Record should be consulted for any revisions to the plans. Proposed revisions to the design must be discussed with Engineering Inspector and/or Civil Engineer at the City of Tucson Development Services Department Engineering Division, prior to any construction activity, to determine whether additional details, calculations, drainage report, or a revised grading plan is needed, or, whether changes may be provided on as-builts. All work completed without approval is subject to Stop Work Order. 27) If grading construction is expected to last longer than the expiration date of the grading permit, contact DSD to renew/extend the Grading Permit. If Final Grading Inspection has not been completed before the Grading Permit expires, and the permit has not been renewed, additional fees and reviews may be required. 28) There shall be no disturbance along the Maxwell WASH embankment. There shall be no vehicle access, storage or any type of disturbance outside of the approved disturbance/grading limits as shown on the approved plans, and no grading shall begin until all required SWPPP controls are installed. Stop Work Order may be issued for disturbance outside of grading limits. 29) Contact Permits and Codes (837-6606) for any questions regarding City of Tucson right-of-way permit requirements. 30) Submit sewer installation / inspection reports to PCWW. 31) Separate building permit applications are required for any walls. 32) Prior to requesting for release for CofO, final Grading Inspection approval by DSD Engineering is required. 33) All areas that are disturbed due to the construction activity for this project shall be stabilized. 34) Prior to request for final grading inspection approval, all permanent erosion control improvements shall be installed and accepted by DSD including rock / established revegetation for all disturbed areas if not improved as per approved plan. 35) The permitee shall notify the DSD when the grading operation is ready for final grading inspection. Final grading approval shall not be given until all work, including installation of all drainage improvements and their permanent protective devices, and all permanent erosion control measures have been completed in accordance with the approved grading plan and grading permit, and all conditions of permit are completed. 36) Prior to request for final inspection approval, any outstanding fees shall be paid. 37) Letters of certification from Geotechnical/Soils Engineer are required along with field observation and testing reports, at final grading inspection stage. Acceptance of retaining systems are also required. 38) Letters of certification from Engineer of Record for project substantial completion of project, as well as a letter for the basin completion and function, and As-built Grading Plans and CD are required per DS Sec.11-01.16, and shall be submitted prior to final grading inspection. 39) Submit a copy of the updated WASH Ordinance Report for archive as discussed in the 25NOV08 meeting. If you have any questions, contact me at 837-4934. Elizabeth Eberbach, PE Civil Engineer Engineering Division Development Services |
| 12/29/2008 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 01/27/2009 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |
| 01/27/2009 | SUE REEVES | REJECT SHELF | Completed |