Permit Number: T05CM01519
Parcel: 13609016A

Review Status: Completed

Review Details: RESUBMITTAL - SITE ALL

Permit Number - T05CM01519
Review Name: RESUBMITTAL - SITE ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/21/2005 JIM EGAN FIRE REVIEW Approved
09/26/2005 ANDREW CONNOR NPPO REVIEW Denied Case # SCZ 05-14 comments must be addressed and revisions implemented on appropriate plans to continue review.
09/26/2005 ANDREW CONNOR LANDSCAPE REVIEW Denied 1. Case # SCZ 05-14 comments must be addressed and revisions implemented on appropriate plans to continue review.

2. Sheet C2 of the grading plan indicates an on-site waste disposal field within the scenic route buffer area. Improvement is not a permitted within SCZ per LUC 3.7.5.2.C relocate as necessary.

3. Revise the native plant preservation plans and landscape plan to show the limits of grading DS 2-15.3.4.A

4. Revise the plans to clarify that disturbed portions of the adjacent public-right-of-way areas will be re-vegetated per LUC 3.7.5.2.D.

5. Additional comments may apply.
09/28/2005 DAN CASTRO ZONING HC SITE REVIEW Approved
09/28/2005 DAN CASTRO ZONING REVIEW Denied COMMENTS: This review is based on a greater than 25% building area expansion resulting in full code compliance of the entire site. Please resubmit revised drawings along with redlines and a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.

1. SCZ application approval is required prior to site plan approval. The previous comment will remain until it has been approved.
Previous comment: This project is within the Scenic Corridor Zone (SCZ). A separate review is required for the SCZ. The case number for the SCZ review must be noted in the lower right corner of each sheet of the site plan, landscape and NPPO plans. All required elements of the SCZ (i.e. 30 foot buffer, view corridors, approved colors, etc..) as shown on the approved SCZ plan must be added to the site plan, along with date of approval and any conditions placed on that approval.

2. The vehicle parking calculation includes vehicle parking for education. Does this mean that the site contains a separate private school? If so, add the education land use class as a secondary principal land use. Refer to SR zone in the LUC for designator and classification. Refer to LUC Sec. 3.3.5.3 for mixed use parking requirements.
If the educational use is for Sunday school only, remove the parking requirements for education from the calculation, It is not necessary to provide vehicle parking for a Sunday school. (D.S. 2-02.2.1.A.8)

3. Existing sign (keynote 27) is located in the future right-of-way. The sign will need to be removed at time of roadway widening. Approval by the Engineering section is required to allow the sign to remain in its present location. At time of site plan approval, a city stamp will be added to the plan explaining the requirement for the sign to removed at time of widening and at no expense to the City of Tucson. (D.S. 2-02.2.1.A.13) (D.S. 2-02.2.1.A.25)

If you have any questions about this transmittal, please call Dan Castro, (520) 791-5608 ext. 1180. An appointment is required to discuss these comments in person.
10/12/2005 ANY ENGINEERING REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
10/12/2005 DELMA ROBEY APPROVAL SHELF Completed
10/12/2005 DELMA ROBEY OUT TO CUSTOMER Completed
10/12/2005 DELMA ROBEY REJECT SHELF Completed