Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T05CM01144
Parcel: 10604098C

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T05CM01144
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/01/2005 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Termination of a condensate drain to the tailpiece of a kitchen sink is not an approved location. The condensate drain may terminate into:
a. The inlet of an approved lavatory trap, a funnel drain, a floor sink, laundry tray.
b. At or below grade outside the building in an area capable of absorbing the condensate flow without surface drainage.
c. Over roof drains or gutters or downspouts that connect to drainage pipes, provided they terminate at or above grade in an area capable of absorbing the condensate flow without surface drainage.
2. There is no lower limit for the requirement to show that the installation of mechanical equipment will not damage the structure. Provide structural calculations to verify that the existing roof is capable of supporting the additional dead load due to the installation of the roof top units. Any deferred submittals must be approved in advance by the Building Official. Reference Section 302.1, IMC 2000.
3. Section 306.6 requires the installation of a level, working platform with guards for all roofs with a pitch of 3 vertical units per 12 horizontal units. See Section 306.6 for the required minimum dimensions. Provide service space for roof-mounted equipment. Reference Section 306.6 IMC.
4. Provide gas service to the rooftop units. Reference Section 309.1, IMC 2000.
09/02/2005 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Section 707.4(4) permits the installation of "an approved two-way cleanout fitting". The two-way cleanout shown on sheets P1 and P2 is in violation of Section 707.6 which requires each cleanout fitting to be installed in the direction of flow. Provide the listing information for the proposed 2-way cleanout shown on sheets P1 and P2 or provide an upper terminal cleanout. Reference Sections 707.4 (4) and 707.6, UPC 1994.
2. Sheet SD-1shows a new 4" building sewer but sheet P1 still shows a new 6" building sewer. Coordinate the two sheets. Reference Section 103.2.3, UPC 1994.
3. The submitted drawing shows a sink trap, not an indirect waste receptor as detailed in Section 804.1. Revise the design of the indirect waste receptor for the clothes washer to comply with the requirements of Section 804.1, UPC 1994.
4. Comment not addressed. Provide information (i.e. Manufacturer's cut sheets) to show that none of the proposed fixtures requires a minimum pressure less than 15-PSI. Reference Section 608.1, UPC 1994.
5. Revise the water fixture units using Tables 6-3 and A-2, UPC 1994. The clotheswasher would be defined as "public" use since it is not under the control of a family or an individual. Include the water supplies to the refrigerators per Table 6-3. Correct the arithmetic on the fixture unit calculations. Reference Section 202.0, UPC 1994.
6. Water supply isometrics are required on all commercial projects. Provide water supply isometrics. Reference Section 103.2.3, UPC 1994.
7. Route the T&P relief piping so that it is not trapped. Reference Section 608.5, UPC 1994.
8. The submitted cut sheet for the specified water heater indicates it is a direct-vent system. Provide a detail showing the size, configuration, and termination of the vents. Correct the model number of the water heater that is shown on sheet P1 to agree with the submitted cut sheet. Coordinate the electrical requirements for the water heaters. Reference Section 512.5, UPC 1994.
9. Revise the natural gas schematic to show the loads and developed lengths of the gas piping to the rooftop A/C units. Correct the sizes of the pipes shown on the submitted schematic using Table 12-3 for the developed pipe lengths. Reference Section 1217.1, UPC 1994.
09/02/2005 JIM EGAN FIRE REVIEW Approved
09/07/2005 GERRY KOZIOL WWM REVIEW Approved
09/15/2005 PATRICIA GILBERT ENGINEERING REVIEW Approved
09/26/2005 LINDA BUCZYNSKI ELECTRICAL-COMMERCIAL REVIEW Denied TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL.

PLEASE CALL AT 791-5550 X1106 OR EMAIL AT Linda.Buczynski@tucsonaz.gov
IF YOU CARE TO DISCUSS.

1. Apartment plans have refrigerator and garbage disposal on Ckt 10. Panel schedule only accounts for refrigerator on this circuit. Please clarify.
2. Provide Arc-fault circuit protection as required in NEC 210.12, for all branch circuits powering bedroom 125V single-phase 15A and 20A outlets. Could not find such specification on current submittal.
3. Original plans called for washers. No laundry circuit indicated on current submittal. Please demonstrate compliance with NEC 210.52 (F). If one of the two Exceptions are invoked, please indicate which one in the response letter.
4. Water Heater is gas per Sheet P1, is gas. Please reconsider 2-P, 18.8A electrical load.
10/05/2005 CHRISTY FOREMAN BUILDING-COMMERCIAL REVIEW Denied CITY OF TUCSON DEVELOPMENT SERVICES
STRUCTURAL REVIEW COMMENTS

DATE: 10/7/05
ACTIVITY NUMBER: T05CM01144
PROJECT NAME: Storage Bldg. Converted to 3 residential units
PROJECT ADDRESS: 340 E. Yavapai Rd.
ARCHITECT / ENGINEER: BT design group
PROJECT REVIEWER: Christy Foreman



TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL.

PLEASE CALL AT 791-5550 X1108 OR EMAIL AT CFOREMA1@CI.TUCSON.AZ.US IF YOU CARE TO DISCUSS.

1) Clarify location of overhang from property line. See section 704.2.3 It appears underside of overhang and facia will need to be fire rated.
2) New openings in existing wall clarify / detail new 2x6 each side of opening at existing 2x4 exterior wall framing. See structural calculations page 7.
3) Provide justification of mech. unit load on existing trusses. See structural calculations page 9a.
10/10/2005 TERRY STEVENS ZONING REVIEW Denied 10/10/05

Development Services Department
Zoning Review Section

Terry Stevens
Lead Planner


Building Plans: T05CM01144

Comments:

1. Zoning will review and approve the building plans once the structural and commercial reviewers have approved the building plans.


If you have any questions about this transmittal, please call Terry Stevens, (520) 791-5550 ext. 2000.

Final Status

Task End Date Reviewer's Name Type of Review Description
10/17/2005 GBONILL1 OUT TO CUSTOMER Completed
10/17/2005 SUE REEVES REJECT SHELF Completed