Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T05CM01015
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/28/2005 | ELIZABETH EBERBACH | ENGINEERING | REVIEW | Denied | DATE: 28JUL05 SUBJECT: 1710 West Riverview Boulevard Site Plan and Floodplain Use Permit reviews ACTIVITY NUMBERS: T05CM01015/T05OT00516 LOCATION: T14S, R13E, Section 3 Summary: Engineering Division has reviewed the Drainage Study Report and Site Plan, and approval is not recommended at this time. Please address the comments, and include a response letter addressing all comments. DRAINAGE REPORT COMMENTS: 1) Tucson Code 26-5.2(9): It is stated in the Drainage Report on page 8 that the recommended FFE be elevated to 2311.75. The encroachment states that the project will increase the WSEL to 2311.46. The FFE shall be elevated to 1 foot above the base flood elevation. Revise the Drainage Report to reflect compliance with Floodplain Ordinance and state statute. 2) Tucson Code 26-8(d)(2): In areas where fill is to be used to raise the elevation of the building site, the building shall be located no less than 25 feet from any edge of the fill for the pad, unless a study prepared by a state-registered professional civil engineer and approved by the city engineer shows that a lesser distance is acceptable. The report must explain how the design will provide appropriate pad size, erosion protection, and lowest floor elevation recommendations based upon El Rio Wash 100-year flooding depths and velocities. Provide design for the building pad to comply with this section of regulation. Explain in report that the required fill shall be placed where it does not divert, retard or obstruct the flow of water to such an extent that it creates a danger or hazard to life or adverse impact to adjacent properties. 3) Tucson Code 26-5.2(5): Provide FIS study section for this location and discuss/compare water surface elevations at this location in Drainage Report in addition to the explanation that the proposed conditions will not increase off site water surface elevations by more than a tenth of a foot. Clarify Drainage Report page 8 to provide a statement that no adverse impact will occur to adjacent properties - upstream or downstream or in the public right of way, and that there will not be an increase in the Base Flood Elevation by more than a tenth of a foot. 4) DS Sec.10-02.12.2.1.4: Flow depths shall not exceed 1-foot during the 100-year event. Provide design for the access driveway and parking area that complies with AWA (All-weather access) restrictions. 5) DS Sec.10-02 2.3.1.4.C.1- 6: Depict 100-year floodplain direction of the flow on a drainage exhibit. 6) Tucson Code 26-5.2(9): An elevation certificate will be required. A note will be needed on the subsequent grading plan stating that prior to the pouring of the first slab or finish floor installation, the applicant shall submit to the city engineer certification by state-registered land surveyor or a state-registered professional civil engineer that the elevation of the lowest floor is in compliance with that approved elevation from the elevation certificate and that shown on the plan. SITE PLAN COMMENTS: 7) DS Sec.2-02.2.1.A.23: From the drainage study, a grading plan is required to meet the required elevated pad condition. Show contour lines and/or spot elevations for existing and proposed conditions on the Site Plan. The Site Plan may be titled as Site/Grading Plan. Elevation data must be in accordance with National Geodetic Vertical Datum (NGVD) 1929 for FEMA floodplain development and permitting requirements. Provide North American Vertical Datum (NAVD) 1988 for site/grading plan. The site plan must include a local benchmark elevation with reference to City datum (NAVD 1988), and reference City Field Book and Page or GPS control point. 8) DS Sec.2-02.2.1 A 16: Show drainage patterns, proposed finish floor elevation and finish grades, per recommendations of the Drainage Report, to depict a building pad that meets acceptable FFE and FPE elevations and meets Tucson Code section 26-8(d)(2) as described in the Drainage Report. 9) DS Sec.2-02.2.1.A.15: Depict 100-year floodplain water surface elevations onsite on the planview. 10) DS Sec.3-01.4.4.B: Provide cross section and spot elevations for parking area in plan view showing depths and compliance with all weather access. 11) DS Sec.2-02.2.1.A.17: Revise the estimated cut and fill quantities based on the building pad which needs to be elevated per the Drainage Report. Also provide disturbance area in square feet. A Grading Permit Application is required. Submit the revised Drainage Report, revised Site Plan, grading permit application and complete response letter. If you have any questions, I can be reached at 791-5550, extension 2204. Elizabeth Eberbach, PE Civil Engineer Engineering Division Development Services |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 08/08/2005 | JMORALE1 | OUT TO CUSTOMER | Completed |
| 08/08/2005 | SUE REEVES | REJECT SHELF | Completed |