Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: REVISION
Permit Number - T05CM01003
Review Name: REVISION
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/27/2005 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | Considering Panel 4P2 on an aggregate basis, the load calculations are correct. But we check for "high phase", and any other phase which in itself could be overloaded. Starting with Phase C which tallys at 25,110 VA, the total of receptacles is 10,090 VA. 25,110 - 40 + 350/3 = 25,187 or 210A. Since the panel is 225A MLO, it is probably fine as long as the 200A designation on the panel schedule can be addressed. Going to the line diagram, the 3/0 conductor lengths and the 175AF need re-evaluation. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
06/27/2005 | BETH GRANT | OUT TO CUSTOMER | Completed |