Permit Review Detail
Review Status: Completed
Review Details: CELL TOWER/ANTENNAS
Permit Number - T05CM00735
Review Name: CELL TOWER/ANTENNAS
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/18/2005 | JIM EGAN | FIRE | REVIEW | Approved | |
| 02/18/2005 | DAVID RIVERA | PLANNING-CITY HALL | REVIEW | Approved | |
| 02/18/2005 | PATRICIA GILBERT | ENGINEERING | REVIEW | Approved | |
| 03/03/2005 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1106 OR EMAIL AT Linda.Buczynski@tucsonaz.gov IF YOU CARE TO DISCUSS. 1. Please demonstrate that the SSC is a listed piece of equipment. 2. Please remove the #6G in the run between the meter and the disconnect, as a redundant path to ground. 3. Please reevaluate panel loading. It appears that Phase A has a connected load of 17980 VA and that Phase B has a connected load of 19,000 VA according to the loads indicated at the branch circuit level. This would compute to 154A, not 117.5. And it appears that the Rectifier on Ckt 9,11 has 2000 VA on Phase A and 3200 VA on phase B. Please clarify. 4. Please provide available fault current and rating of equipment. If fault current information is not readily available from TEP, add the following note: "Contractor shall obtain available fault current from TEP, and shall install equipment within the rating of available AFC." |
| 03/17/2005 | RAUL PALMA | BUILDING-COMMERCIAL | REVIEW | Denied | 1) Provide a soils report as indicated on sheet 9 of calcs. 2) Special inspection is required for structural masonry. |
| 03/28/2005 | JAY HOGAN | OPERATIONS | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 03/31/2005 | DELMA ROBEY | OUT TO CUSTOMER | Completed |