Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T05CM00522
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/18/2005 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 04/21/2005 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Comment not resolved. See the Mechanical General Notes on sheet M1. The 2000 International Mechanical Code is the relevant code for this project, not the Uniform Mechanical Code. 2. Comment not resolved. Provide sufficient heat for the kitchen, prep area, and delivery area to maintain a minimum temperature of 68°F on a design heating day (32°F). The prep and delivery rooms have no source of heat at all. Reference Section 309.1, IMC 2000. 3. Comment not addressed. Coordinate the construction of the mounting wall for the hood as shown on the manufacturer's submittal shown on sheet M-2 with the wall construction shown on sheet T-1. Reference Section 106.3.1, IMC 2000. 4. Provide a design for the oven hood shown on sheet T-3. If the hood is integral to the oven, provide listing information from the manufacturer. Reference Section 106.3.1, IMC 2000. 5. Comment not addressed. Show that the make-up air for the two kitchen hoods complies with 508.1.1, IMC 2000. |
| 04/21/2005 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide the name of the water heater manufacturer and a cut sheet showing the specifications of the proposed water heater. 2. Comment not addressed. Show the size and overall height for the water heater vent. Reference Sections 512 and 518, UPC 1994 with AZ State amendments. 3. The water calculations showing an available loss of 5.75 psi/100ft do not support the pipe sizing. Reference Section A5, UPC 1994. 4. Revise the size of the traps for the floor sinks located in the Service area to match the size of the trap arms or modify the trap arm lengths to conform to Table 10-1, UPC 1994 with AZ State amendments. Reference Section 1003.3, UPC 1994. 5. Comment not addressed. Floor sinks can't be connected to a grease trap. Reference Section 1011.3, UPC 1994. 6. Comment not addressed. Show the natural gas piping on the plumbing plan. Reference Section 103.2.3, UPC 1994. 7. Comment not addressed. Size natural gas pipe using Table 12-3, UPC or provide calculations demonstrating conformance to Section 1217.3, UPC 1994. A 1-1/2" pipe cannot support 775 CFH with a developed length of 66 feet. |
| 04/29/2005 | DOUG LAAKSO | BUILDING-COMMERCIAL | REVIEW | Denied | .. T05CM00522-1 .. 1710E SPEEDWAY BL .. DGL .. 2nd REVIEW .. 4/29/05 S1. See prior comment #S4, bring toilet room into conformance with ANSI A117.1-2003 Section 6.(S4. Detail accessible toilet rooms per ANSI A117.1-2003ed.) S2 See prior comment #S6, provide requested calculations and show connection details including connections to existing roof framing , and calling out material and fasteners (type, number, size). ( S6. Provide structural calculations and details for soffit support ref 3/T2.) S3. See prior comment #S9, provide requested calculations and details. (S9. Provide structural calculations and details for hoods ref T3 & 7/M2 and new roof-mounted equipment.) S4. See prior comment #S10, provide requested detail/s. (S10. Provide details for roof penetrations.) S5. See prior comment #S11, show required finishes at toilet room per 2003 IBC Section 1210. (S11. Provide ceiling suspension system/framing and finishes for toilet rooms.) Questions? Call Douglas Laakso Structural Plans Examiner for the City of Tucson Development Services Department at (520) 791-5550 x1111. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 05/04/2005 | GBONILL1 | OUT TO CUSTOMER | Completed |