Permit Number: T05CM00311
Parcel: 117061910

Address:
11 S 6TH AV

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T05CM00311
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/25/2005 JIM EGAN FIRE REVIEW Denied Exit corridor/exit separaton required for access to exits.
01/25/2005 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Use the fixture unit values from Table 6-3 to determine the water piping sizes. Include all of the fixtures and the water requirements of the HVAC compnents. Reference Sections 610.1 and 610.5, UPC 1994.
2. Revise the size of the water pipes to correspond to the submitted water pressure calculations.
3. Revise the layout of the waste piping to show the fittings in the correct relationship to the direction of flow. Reference Section 311.7, UPC 1994.
4. Provide for a cleanout downstream of the lift station.
01/25/2005 MICHAEL ST. PAUL ZONING REVIEW Approved
01/25/2005 ROBERT SHERRY WATER REVIEW Approved
01/25/2005 BLANCA ESPINO ENGINEERING REVIEW Approved
01/25/2005 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied Provide ventilation calculations for the heating of the building.
01/26/2005 CHRISTY FOREMAN BUILDING-COMMERCIAL REVIEW Needs Review
01/26/2005 TACHONG1 WWM REVIEW Needs Review
01/26/2005 LINDA BUCZYNSKI ELECTRICAL-COMMERCIAL REVIEW Denied t05cm00311 denied 1/26/05

1. Show Panel MP on plans. Could the panel marked MU indeed me MP?
2. EC-1 is specified on mechanical plans as 3/4 HP, but on panel schedule as 1 1/2 HP. Notes 2 and 4 on mechanical schedule appear to contradict one another. Coordinate with mechanical and recheck circuit loading per NEC Table 430.148.
3. Provide power requirements for EC-2 on mechanical plans.
4. Water heater is specified on plumbing. Could not find on electrical plans or schedules.
5. Smart pack and sign are on Panel Schedule P2. Could not find on plans.
6. Note that loading on panel P2 feder is close to ampacity of conductors and panel capacity. In fact, the high phase is over by a fraction of an amp.
7. Provide AFC and if necessary fault calculations to demonstrate proper rating of panels.
8. Provide size of Panel MP feeder.
9. P2 feeder Equipment Grounding Conductor shall be #4, not #6. Reference NEC Table 250.122.

Final Status

Task End Date Reviewer's Name Type of Review Description
01/26/2005 TAMI ACHONG OUT TO CUSTOMER Completed