Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T05CM00163
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/19/2005 | BOB SUBA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
04/27/2005 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Comment not resolved. Include the water requirements of the HVAC equipment when calculating the total demand and determining pipe sizes. Reference Section 610.1 and Table 6-3, UPC 1994. 2. Comment not resolved. Calculate the water demand using the fixture units shown in Tables 6-3 (e.g. the service sink). A service sink is rated at 4 water fixture units and 3 waste fixture units. Reference Section 610.3, UPC 1994. 3. The available water pressure and calculations shown on sheet 4 indicate that the available static pressure is only 26 PSI, too low to use Table 6-4 (30-45 PSI). Note: see Sections 610.7 through 610.9 for the calculation and sizing methods. Reference Section 610.4, UPC 1994. 4. The note indicating the materials to be used for the water, waste, and vent piping is incomplete: show the minimum schedules (i.e. wall thickness) of the specified pipe. If "or eq" is allowed for the specified materials, provide the names of the equivalent piping materials that will be considered and show what, if any, effect the material choice will have on the pipe sizing. 5. Comment not addressed. Coordinate the isometric for the water supply and the water piping shown on the plumbing floor plan. 6. Correct the typographical error, 3" HTW, used in the plumbing plan on sheet 4. 7. The waste line from the drinking fountain cannot connect to the vent pipe for the water closets. Reference Section 311.4, UPC 1994. |
04/27/2005 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Comment not resolved. Provide listed and labeled fire dampers for ALL ducts and louvers penetrating fire resistive walls. Note that the duct from the evaporative cooler cannot be run parallel through the East-West fire partition of the service area. Reference Sections 607.3, and 607.5.2, IMC. 2. Comment not resolved. Show how the specified heat pumps are capable of maintaining a minimum temperature of 68°F in the interior spaces intended for occupancy on a design heating day (32°F) without electric heat. Note: provide heat load calculations. Reference Sections 309.1 and 312, IMC 2000. |
05/04/2005 | PETER MCLAUGHLIN | ZONING | REVIEW | Denied | Provide a copy of the approved site plan or C of O for the existing charter school associated with the proposed library to verify that this is an approved use and not a change of use. |
05/04/2005 | PETER MCLAUGHLIN | BUILDING-COMMERCIAL | REVIEW | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
05/06/2005 | BETH GRANT | OUT TO CUSTOMER | Completed |