Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T05CM00163
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/24/2005 | Robert Sherry | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Include all fixtures (e.g. the drinking fountain and the hose bibb shown in detail 7/M-2) and the water requirements of the HVAC equipment when calculating the total demand and determining pipe sizes. Reference Section 610.1, UPC 1994. 2. Calculate the water demand using the fixture units shown in Tables 6-3 (e.g. the service sink). Reference Section 610.3, UPC 1994. 3. Provide the available water pressure and water pipe sizing calculations. Reference Section 610.4, UPC 1994. 4. Limit the water velocity to less than 10 fps or the maximum values given in the appropriate Installation Standard. Reference Section A6.1, UPC 1994. 5. Indicate the materials to be used for the water, waste, and vent piping. 6. Clarify the equipment and services being provided for this project; natural gas service, a water heater, and modifications to the gutters and downspouts are all called out in the notes on sheet 4 but not shown on the plans. 7. The notes on sheet 4 refer to the site plan for key plumbing information such as the floor elevation and the manhole rim elevations, but none of this information is shown on the site plan. 8. Coordinate the isometric for the water supply and the water piping shown on the plumbing floor plan. 9. Provide upper terminal cleanouts on horizontal drainage pipes exceeding 5 feet in length (horizontal drain lines serving sinks and urinals require cleanouts regardless of length). Reference Section 707.4, UPC 1994. 10. Unless the piping arrangement makes it impractical or there are structural features that preclude running the building drain lines at a uniform slope of ¼" per foot, the minimum acceptable slope within the building is ¼" per foot. Reference Section 708.0, UPC 1994. 11. Clarify the term 3" HTW used in the plumbing plan on sheet 4. |
01/24/2005 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Terminate condensate drains in accordance with Section 307.2.1, IMC as amended by the City of Tucson. Reference Sections 801.1 and 807.2, UPC 1994. 2. Revise the provided ventilation calculations using the occupant load data from Table 403.3, IMC 2000. 3. Provide listed and labeled fire dampers for ducts and louvers penetrating fire resistive walls. Reference Sections 607.3, and 607.5.2, IMC. 4. Show how the specified heat pumps are capable of maintaining a minimum temperature of 68°F in the interior spaces intended for occupancy on a design heating day (32°F) without electric heat. Reference Section 309.1, IMC 2000. |
01/24/2005 | ROBERT SHERRY | WATER | REVIEW | Approved | |
02/03/2005 | BOB SUBA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | 1.see attached sheet. 2.finish elec.plan (include total wattages per phase & calculate panel and service loads. 3. provide IECC lighting budget calculations. |
02/11/2005 | GERRY KOZIOL | WWM | REVIEW | Approved | |
02/25/2005 | CHRISTY FOREMAN | BUILDING-COMMERCIAL | REVIEW | Denied | CITY OF TUCSON DEVELOPMENT SERVICES STRUCTURAL REVIEW COMMENTS DATE: 3/1/05 ACTIVITY NUMBER: T05CM00163 PROJECT NAME: Charter school library PROJECT ADDRESS: 1515 W. Prince Rd. ARCHITECT / ENGINEER: Paul Kilonzo Nzomo PROJECT REVIEWER: Christy Foreman TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1108 OR EMAIL AT CFOREMA1@CI.TUCSON.AZ.US IF YOU CARE TO DISCUSS. 1) Clarify / justify A3 use it appears that this will be a Educational Group 'E" occupancy see section 305 occupant load must be < 100 to be A3. 2) Clarify separated / non-separated use. Clarify / justify allowable sq. footage. 3) Show wall section of 2 hr. CMU to clarify proper separation. 4) Clarify restroom facilities finished per section 1210. 5) Need to provide restroom facilities per chapter 29 IBC. It appears 2 male water closets, 2 male lavatories, 2 female water closets, 2 female lavatories are required. Restroom facilities must meet ANSI A117.1 2003 requirements. 6) Detail 4 & 6 sht. 3 clarify which will be used. 7) Bath 2 clearance for door to exit per ANSI A117.1 - 2003. 8) Clarify existing CMU wall to be removed at bath 2 is non-bearing. 9) Provide adjusted valuation. |
03/04/2005 | PETER MCLAUGHLIN | ZONING | REVIEW | Denied | No approved plan or C of O for a charter school was found with the submittal packet. Provide a copy of the approved site plan or C of O for a charter school to verify that this is not a change of use. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
03/07/2005 | TAMI ACHONG | OUT TO CUSTOMER | Completed |
03/07/2005 | SUE REEVES | REJECT SHELF | Completed |