Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T05BU03025
Parcel: 133170630

Address:
350 N WILMOT RD

Review Status: Completed

Review Details: GRADING

Permit Number - T05BU03025
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/24/2006 ANDREW CONNOR NPPO REVIEW Denied Submit City of Tucson stamped and approved development plan including landscape and NPPO plans, review will continue upon re-submittal of requested documents
02/03/2006 LAITH ALSHAMI ENGINEERING REVIEW Denied Laith Alshami, Engineering and Floodplain Review, 02/03/2006

1- The Grading Plan can not be reviewed before the Development Plan is submitted for review at least once. The Grading Plan can be submitted after the first Development Plan review is completed.
2- The Drainage Report does not have drainage exhibits that show the existing and proposed watersheds and all proposed drainage patterns and solutions. Consequently, the Drainage Report can not be reviewed.
3- The PAD has not been approved yet.
4- The SWPP will be reviewed with the next submittal of the Grading Plan.
02/19/2006 DAVID RIVERA ZONING REVIEW Denied 02/19/06

Development Services Department
Zoning Review Section

David Rivera
Principal Planner

Comments:

1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed.

2. Zoning could not verify that the grading plan was in compliance with the approved development plan. Please submit two copies of the approved and stamped development, landscape, and NPPO plans with the next grading plan submittal.

3. Zoning will re-review the grading plan on the next submittal to ensure compliance with the approved site/development plan. Additional comments may be forthcoming.

4. A site card with DSD approvals by Fire, Zoning, Handi-cap, Engineering, and Landscape/NPPO including the approved development plan stamped for site plan approval and signatures is required before the grading plan can be approved by Zoning. Two copies of the approved development plan, landscape and NPPO plans are to be submitted with the grading plans packet for processing and approval as a site plan. No fees are involved in re-stamping the development/tentative plat plans as an approved site plan. The development plan may be walked through for stamps and site card sign off. Submit the following: two copies of the stamped development plan, landscape and NPPO plans must be included with the grading plans packet processed together for site approval.

Final Status

Task End Date Reviewer's Name Type of Review Description
02/23/2006 GBONILL1 OUT TO CUSTOMER Completed
02/23/2006 SUE REEVES REJECT SHELF Completed