Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - GRADING
Permit Number - T05BU02320
Review Name: RESUBMITTAL - GRADING
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/16/2006 | ANDREW CONNOR | NPPO | REVIEW | Approv-Cond | |
| 07/05/2006 | DAVID RIVERA | ZONING | REVIEW | Denied | 07/07/06 Development Services Department Zoning Review Section David Rivera Principal Planner Comments: 1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning will re-review the grading plan on the next submittal to ensure compliance with the approved site/development plan. Additional comments may be forthcoming. 3. The previous comment has not been addressed. A site card with DSD approvals by Fire, Zoning, Handi-cap, Engineering, and Landscape/NPPO including the approved development plan stamped for site plan approval and signatures is required before the grading plan can be approved by Zoning. Two copies of the approved development plan, landscape and NPPO plans are to be submitted with the grading plans packet for processing and approval as a site plan. No fees are involved in re-stamping the development/tentative plat plans as an approved site plan. The development plan may be walked through for stamps and site card sign off. Submit the following: two copies of the stamped development plan, landscape and NPPO plans must be included with the grading plans packet processed together for site approval. 4. The grading plan does not match the approved development plan. The development plan has been approved with locations for H.C. parking spaces and access ramps for both buildings. The access ramp for the building next to Houghton Road has not been drawn and labeled or the plan. Draw the access ramp to match the development plan. Also the access ramps detail drawings are incorrect. the truncated domes have been drawn incorrectly. See redlines on grading plans. 5. Zoning is willing to re-review the grading plan over the counter once the corrections have been made to the plans. Re-stamp of the grading plans will be required by the Landscape and Engineering reviewers. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 07/07/2006 | ADRIANNE OLIVO | OUT TO CUSTOMER | Completed |