Permit Number: T05BU02254
Parcel: 130010050

Review Status: Completed

Review Details: RESUBMITTAL - GRADING ALL

Permit Number - T05BU02254
Review Name: RESUBMITTAL - GRADING ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/04/2006 ELIZABETH EBERBACH ENGINEERING REVIEW Approved TO: M3 Engineering
SUBJECT: 2965 E FAIRLAND SV resubmittal Site Plan and Grading Plan Review
LOCATION: T15S, R14E, Section 24, Ward 5
REVIEWER: Elizabeth Eberbach
ACTIVITY NUMBER: T05BU02254, T05CM04691

Summary: Engineering Division has reviewed the revised drainage report, site package report, two sets of the revised site and grading plans within the resubmittal package, and can recommend approval once the additional sets are received and stamped. Consultant came to the counter December 4, 2006, and stated they will be providing additional two sets as discussed at the counter which are needed prior to picking up permit. The two additional sets shall be received, approved, and stamped as the conditional approval. The following conditions will apply to the grading permit. The Hydrology Study dated 21NOV05 by M3 Engineering was accepted for this project.

GRADING PERMIT CONDITIONS:
1) Call for SWPPP inspection and Pre-construction meetings. For a DSD Engineering Inspections, call IVR (740-6970), or schedule with a Customer Service Representative at the Development Services Department, or contact DSD Engineering at 791-5550 extension 2101, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html
2) Overlay zone application required.
3) Any disturbance within the 50-ft W.A.S.H. Ordinance Study Area will require the project to be stopped until a full W.A.S.H. Ordinance Report with W.A.S.H. Mitigation Plan is submitted for review and approval by DSD Engineering and then reviewed by stormwater committee(s).
4) There shall be no stockpiling, material storage, vehicle crossing/parking/storage or any type of grading activity within the W.A.S.H. Ordinance Study Area.
5) Heavy duty construction fence is required at west side of project to define limits of disturbance outside of the W.A.S.H. Ordinance Study Area.
6) There shall be no disturbance outside of grading limits as defined by the approved plans and as accepted by the initial inspection.
7) There shall be no disturbance of Railroad Wash and the 50-ft study area surrounding the top of bank as defined by the approved drainage report and the approved grading plan.
8) Additional percolation testing may be required at post-grading construction inspection.
9) All grading construction work shall conform to City of Tucson Development Standards Section 11-01.
10) See the associated Stormwater Pollution Prevention Plan as a part of this grading permit. The Stormwater Pollution Prevention Plan shall be updated to show location of concrete washout area on SWPP sheet plan view.
11) A copy of the Grading Plan, Grading Permit, and any Geotechnical Reports shall be kept at the site at all times, until final grading approval.
12) Any revision to the Grading Plan MAY require a re-submittal of a revised grading plan for review. Contact DSD Engineering at 791-5550 to discuss changes in grading design.
13) If grading construction is expected to last longer than the expiration date of the grading permit, contact DSD to renew/extend the Grading Permit. If Final Grading Inspection has not been completed before the Grading Permit expires, and the permit has not been renewed, additional fees and reviews may be required.
14) See the associated Site Plan T05CM04691.
15) Truncated domes are required for access ramps per ADAAG. This is an update to COT standard detail 207.
16) Temporary erosion control devices shall be placed at locations where stormwater runoff exits grading limits to prevent debris, construction silt, and/or chemicals from entering any drainage ways that eventually discharge into the receiving waters.
17) Contact Permits and Codes (791-5100) for any questions regarding right-of-way permit requirements.

I can be reached at 791-5550, ext.2204 if you have questions.

Elizabeth Eberbach, PE
Civil Engineer
Engineering Division
Development Services Department
01/04/2006 ELIZABETH EBERBACH ENGINEERING REVIEW Approved DATE: January 6, 2006
TO: M3 Engineering
SUBJECT: 2965 E FAIRLAND SV resubmittal Site Plan and Grading Plan Review
LOCATION: T15S, R14E, Section 24, Ward 5
REVIEWER: Elizabeth Eberbach
ACTIVITY NUMBER: T05BU02254, T05CM04691

Summary: Engineering Division has reviewed the resubmittal package with the consultant at the counter, and recommends approval of the site and grading plans. The following conditions will apply to the grading permit. The Hydrology Study dated 21NOV05 by M3 Engineering was accepted for this project.

GRADING PERMIT CONDITIONS:
1) Call for SWPPP inspection and Pre-construction meetings. For a DSD Engineering Inspections, call IVR (740-6970), or schedule with a Customer Service Representative at the Development Services Department, or contact DSD Engineering at 791-5550 extension 2101, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html
2) Overlay zone application required.
3) Any disturbance outside of the grading limits and within the W.A.S.H. Ordinance Study Area of Railroad Wash may result in a Stop Work Order.
4) Any disturbance within the 50-ft W.A.S.H. Ordinance Study Area will require the project to be stopped until a full W.A.S.H. Ordinance Report with W.A.S.H. Mitigation Plan is submitted for review and approval by DSD Engineering and then reviewed by stormwater committee(s).
5) There shall be no stockpiling, material storage, vehicle crossing/parking/storage or any type of grading activity within the W.A.S.H. Ordinance Study Area.
6) Heavy duty construction fence is required at west side of project to define limits of disturbance outside of the W.A.S.H. Ordinance Study Area.
7) There shall be no disturbance outside of grading limits as defined by the approved plans and as accepted by the initial inspection.
8) There shall be no disturbance of Railroad Wash and the 50-ft study area surrounding the top of bank as defined by the approved drainage report and the approved grading plan, unless a revised W.A.S.H. Report is submitted for review and approval to DSD and stormwater committees.
9) Additional percolation testing may be required at post-grading construction inspection.
10) All grading construction work shall conform to City of Tucson Development Standards Section 11-01.
11) See the associated Stormwater Pollution Prevention Plan as a part of this grading permit. The Stormwater Pollution Prevention Plan shall be updated to show location of silt fence within lease area on SWPP sheet plan view.
12) Operators for the site shall sign SWPPP prior to commencement of grading construction.
13) A copy of the Grading Plan, Grading Permit, and any Geotechnical Reports shall be kept at the site at all times, until final grading approval.
14) Any revision to the Grading Plan MAY require a re-submittal of a revised grading plan for review. Contact DSD Engineering at 791-5550 to discuss changes in grading design.
15) If grading construction is expected to last longer than the expiration date of the grading permit, contact DSD to renew/extend the Grading Permit. If Final Grading Inspection has not been completed before the Grading Permit expires, and the permit has not been renewed, additional fees and reviews may be required.
16) See the associated Site Plan T05CM04691.
17) Truncated domes are required for access ramps per ADAAG. This is an update to COT standard detail 207.
18) Temporary erosion control devices shall be placed at locations where stormwater runoff exits grading limits to prevent debris, construction silt, and/or chemicals from entering any drainage ways that eventually discharge into the receiving waters.
19) Contact Permits and Codes (791-5100) for any questions regarding right-of-way permit requirements.

I can be reached at 791-5550, ext.2204 if you have questions.

Elizabeth Eberbach, PE
Civil Engineer
Engineering Division
Development Services Department
11/29/2005 ANDREW CONNOR NPPO REVIEW Denied Site plan approval is necessary to continue review.
12/22/2005 MICHAEL ST. PAUL ZONING REVIEW Denied Site plan approval required.