Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T05BU01915
Parcel: Unknown

Address:
4050 E BENSON HY

Review Status: Active

Review Details: RESUBMITTAL - GRADING ALL

Permit Number - T05BU01915
Review Name: RESUBMITTAL - GRADING ALL
Review Status: Active
Review Date Reviewer's Name Type of Review Description Status Comments
01/14/2008 ANDREW CONNOR NPPO REVIEW Approv-Cond
02/04/2008 MICHAEL ST. PAUL ZONING REVIEW Approv-Cond Subject to approval by engineering.

Any changes to the grading plan required by engineering must also be reviewed and approved by zoning.
03/04/2008 ELIZABETH EBERBACH ENGINEERING REVIEW Approved TO: Jeff Stine, PE, EPS Group
SUBJECT: Cantera Grading Plan and Floodplain Engineering Review 4th Resubmittal
LOCATION: T15S R14E Section 10
REVIEWER: Elizabeth Eberbach
ACTIVITY NUMBER: S05-030 (Dos Rios), T05BU01915, T07OT02747

SUMMARY: The revised grading plan package and Floodplain Use Permit application were reviewed by Engineering. The resubmittal package included copies of the revised grading plan, copies of the SWPPP, floodplain use permit application, copies of the final drainage report, copy of the differential grading documentation, latest title report, and response letter. Engineering recommends approval of the Grading Plan and Floodplain Use Permit application. See floodplain use permit T07OT02747 conditions. The Drainage Report was reviewed for Grading Plan purposes only.

GRADING PERMIT CONDITIONS:
The following 19 conditions apply to this grading permit T05BU01915:
1) Call for Pre-construction meeting. For a DSD Engineering Inspection, call IVR (740-6970), or schedule with a Customer Service Representative at the Development Services Department, or contact DSD Engineering at 837-4888, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html
2) A copy of the approved Grading Plan and Permit shall be kept at the site at all times, until final grading approval.
3) These sets of plans act as the approved final grading plans for private grading, paving and drainage construction for CANTERA Subdivision Grading Plans, 4050 E Benson Hy. This grading permit T05BU01915 provides permission to perform private grading, stockpile removal, paving and drainage improvement construction as shown on the approved plans. See Floodplain Use Permit T07OT02747 for Floodplain Use Permit conditions.
4) See the approved Grading Plans for Private CANTERA Private Grading Plans (sealed by Jefferson D. Stine, 12-20-07). The grading permit T05BU01915 will be for earthwork and grading construction for subdivision improvements within the approved grading limits as shown on the approved grading plan.
5) There shall be no disturbance outside of the disturbance/grading limits. Any activity outside of the project boundary may require a construction or maintenance easement and may be required to be reviewed if not already shown on the approved plans.
6) Contact Permits and Codes (837-6606) for any questions regarding City of Tucson right-of-way permit requirements.
7) If grading construction is expected to last longer than the expiration date of the grading permit, contact DSD to renew/extend the Grading Permit. If Final Grading Inspection has not been completed before the Grading Permit expires, and the permit has not been renewed, additional fees and reviews may be required.
8) Revisions to the design must be discussed with a Civil Engineer at the City of Tucson Development Services Department Engineering Division, prior to any construction activity, to determine whether additional details, calculations, drainage report, or a revised grading plan is needed, or, whether changes may be provided on as-builts. All work completed without approval is subject to Stop Work Order.
9) The permitee shall notify the DSD when the grading operation is ready for final grading inspection. Final grading approval or release of reseed bond shall not be given until all work, including installation of all drainage improvements and their permanent protective devices, and all permanent erosion control measures have been completed in accordance with the approved grading plan and grading permit, and all conditions of permit are completed. Any revegetated areas shall require Landscaping approval of established vegetation prior to reseed bond release. Any other exposed areas that are not reseeded shall be covered in gravel, unless other material is proposed and reviewed by the City of Tucson.
10) City of Tucson, DSD Grading and Engineering Inspector shall complete a sidewalk and curb and gutter inspection before final grading approval.
11) Special inspections are required for any cut-off walls, and toedowns.
12) Project Engineering and Geotechnical Engineering completion letters, as well as As-Builts are required to be submitted prior to final Grading Inspection. Letters of certification from Engineer of Record for basin function and project substantial completion are required and shall be submitted prior to final grading inspection.
13) For inspection purposes, post the AZPDES - Posting Requirements green sheet at construction entrances to the site at beginning of construction activities and maintain these posted documents throughout project construction.
14) See the associated Stormwater Pollution Prevention Plan dated 1-2-08 (& 3-4-08: sheet 2) as a part of this grading permit. Interim erosion and sediment controls shall be maintained through out the life of the project per approved grading plans and SWPPP at disturbance limits.
15) Designated concrete washout locations shall not be located in the water harvest or basin area.
16) Temporary erosion and sediment control devices shall be placed at locations where stormwater runoff exits grading limits to prevent debris, construction silt, and/or chemicals from entering any drainage ways that eventually discharge into the receiving waters. Interim erosion and sediment controls shall be maintained per approved grading plans at downstream areas of disturbance limits.
17) The operator shall report to ADEQ any noncompliance (including spills) which may endanger human health or the environment. The operator shall orally notify the office listed below within 24 hours: Arizona Department of Environmental Quality, 1110 W. Washington, 5th floor (5515B-1), Phoenix, AZ 85007, Office: 602-771-4466; Fax 602-771-4505
18) Stockpile permit T06BU00133 shall be resolved by earthwork for approved improvements to the site. Any permanent erosion and sediment controls including gravel and/or reseeding shall be placed and established prior to release of any bond and prior to any request for final approval.
19) Reseeding bond in the amount of $60,450.60 is required unless the plans are resubmitted with a request for grading permits for the North Phase or South Phase separately.

Call me at 837-4934, to discuss any grading permit conditions or other questions you may have for this project.

Elizabeth Eberbach, PE
Civil Engineer
Engineering Division
Development Services

Final Status

Task End Date Reviewer's Name Type of Review Description
03/20/2008 SUE REEVES APPROVAL SHELF RECEIVED