Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - GRADING
Permit Number - T05BU01674
Review Name: RESUBMITTAL - GRADING
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/20/2005 | ELIZABETH EBERBACH | ENGINEERING | REVIEW | Approved | DATE: September 20, 2005 TO: Rick Engineering SUBJECT: Tres Pueblos revised Final Grading Plan & Floodplain Use Permit resubmittal reviews REVIEWER: Elizabeth Eberbach ACTIVITY NUMBERS: S04-003, T05BU01674, T05OT01618 SUMMARY: Engineering Division of Development Services Department reviewed the revised Final Grading Plan, revised CC&R's, and floodplain use permit application submittal, and recommends approval of the grading plan and floodplain use permit with the following conditions to the Grading Permit: GRADING PLAN CONDITIONS: 1) A COPY OF THE GRADING PLAN, GRADING PERMIT, AND ANY GEOTECHNICAL REPORTS SHALL BE KEPT AT THE SITE AT ALL TIMES, UNTIL FINAL GRADING APPROVAL. 2) ALL GRADING SHALL CONFORM TO THE APPROVED FINAL GRADING PLAN STAMPED 8-24-05 AND DEVELOPMENT STANDARDS SECTION 11-01, RECOMMENDATIONS FOR GRADING CONSTRUCTION IN THE GEOTECHNICAL ENGINEERING REPORT BY GRC CONSULTANTS, INC ENGINEERING, DATED NOVEMBER 20, 2003, AS WELL AS GEOTECHNICAL ANY ADDENDA, AND THE ASSOCIATED RICK ENGINEERING DRAINAGE REPORT FOR THIS PROJECT DATED 8/10/04. 3) ANY REVISION TO THE GRADING PLAN MAY REQUIRE A RE-SUBMITTAL OF A REVISED GRADING PLAN FOR REVIEW. CONTACT DSD ENGINEERING AT 791-5550 TO DISCUSS CHANGES IN GRADING DESIGN. 4) IF GRADING CONSTRUCTION IS EXPECTED TO LAST LONGER THAN THE EXPIRATION DATE OF THE GRADING PERMIT, CONTACT DSD TO RENEW/EXTEND THE GRADING PERMIT. IF FINAL GRADING INSPECTION HAS NOT BEEN COMPLETED BEFORE THE GRADING PERMIT EXPIRES, AND THE PERMIT HAS NOT BEEN RENEWED, ADDITIONAL FEES AND REVIEWS MAY BE REQUIRED. 5) SECURITY BARRIERS AROUND PORTIONS OF THE DRAINAGE AREAS MAY BE REQUIRED DURING CONSTRUCTION AND AS PERMANENT CONTROLS AT DRAINAGE CROSSINGS. LOCATIONS SHALL BE AS DETERMINED BY THE ENGINEER-OF-RECORD AND ACCEPTED BY THE CITY OF TUCSON INSPECTORS. 6) CALL FOR PRE-CONSTRUCTION MEETING. FOR A DSD ENGINEERING INSPECTION, CALL IVR (740-6970), OR SCHEDULE WITH A CUSTOMER SERVICE REPRESENTATIVE AT THE DEVELOPMENT SERVICES DEPARTMENT, OR CONTACT DSD ENGINEERING AT 791-5550 EXTENSION 2101, OR SCHEDULE INSPECTIONS ONLINE AT: HTTP://WWW.CI.TUCSON.AZ.US/DSD/ONLINE_SERVICES/ONLINE_PERMITS/ONLINE_PERMITS.HTML 7) PROJECT ENGINEERING AND GEOTECHNICAL ENGINEERING COMPLETION LETTERS, AS WELL AS AS-BUILTS ARE REQUIRED TO BE SUBMITTED PRIOR TO FINAL GRADING INSPECTION. AS-BUILTS SHALL PROVIDE: ADDITIONAL DATUM POLES / SEDIMENT MARKER LOCATIONS ADJACENT TO SIGNIFICANT STRUCTURES; AS-BUILT ELEVATIONS WITHIN THE WESTERN CHANNEL, AS WELL AS AS-BUILT CONDITIONS FOR THE REST OF THE SITE. 8) THE WESTERN WASH IMPROVEMENTS, INCLUDING THE MARKERS, SHALL BE THE RESPONSIBILITY OF THE HOA AND ARE INDICATED FOR MAINTENANCE WITHIN THE CC&R'S. A COPY OF THE RECORDED REVISED FIRST AMENDMENT TO THE CC&R'S ARE REQUIRED TO BE SUBMITTED TO DSD ENGINEERING DIVISION PRIOR TO FINAL GRADING INSPECTION. 9) ADDITIONAL PERCOLATION POST GRADING CONSTRUCTION TESTING MAY BE REQUIRED. 10) SPECIAL INSPECTION REQUIRED FOR WESTERN CHANNEL, W.A.S.H. ORDINANCE RODEO WASH, AND BASINS. INSPECTIONS FOR THE DRAINAGE AREAS ARE REQUIRED FOLLOWING SIGNIFICANT STORM EVENTS AND AT FINAL GRADING INSPECTION. 11) CONTACT PERMITS AND CODES (791-5100) FOR ANY RIGHT-OF-WAY REQUIREMENTS. 12) THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) SHALL BE UPDATED AS NEEDED AND KEPT ON SITE DURING GRADING. 13) SEE FLOODPLAIN USE PERMIT T05OT01618. If you have any questions, I can be reached at 791-5550, extension 2204. Elizabeth Eberbach, PE Civil Engineer Engineering Division Development Services |
09/21/2005 | ANDREW CONNOR | NPPO | REVIEW | Approv-Cond | |
09/22/2005 | DAVID RIVERA | ZONING | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
09/27/2005 | DELMA ROBEY | OUT TO CUSTOMER | Completed |