Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T05BU01005
Parcel: 10825007D

Address:
2008 E RIVER RD

Review Status: Completed

Review Details: GRADING

Permit Number - T05BU01005
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/10/2005 LOREN MAKUS ENGINEERING REVIEW Approved DATE: May 13, 2005
TO: Bruce Wilson, Landmark Engineering
SUBJECT: Rio Vista Condominiums, Grading Plan Review
REVIEWER: Loren Makus
ACTIVITY NUMBER: T05BU01005

SUMMARY: The Grading Plan and Stormwater Pollution Prevention Plan were reviewed by Development Services Department Engineering Division. The Grading Plan and Stormwater Pollution Prevention Plan (SWPPP) were not approved at this time.
Grading Plan comments:
1. Include a copy of the stamped approved tentative plat with the resubmittal. The grading permit cannot be approved without a copy of the approved tentative plat.
2. A floodplain use permit is required before the grading permit can be approved. Submit a complete floodplain use permit application along with the $50 permit fee and a $150 hydrology report review fee as required by the floodplain ordinance.
3. All type on the plans must be at least 12 point. Revise the plan on sheet one and on other sheets as needed. ( Stationing information on street monument is less than 12 point in some locations.)
4. Revise General Note 1 to indicate that the 2003 Standard Specifications will be followed.
5. Various callouts for details refer to incorrect details. Revise the plans as necessary to provide correct references.
6. As we discussed, clarify the uses of the properties adjacent to the east property boundary. Where the property adjoins residential uses other than 2 story multi-family, show that the differential grading requirements of the development standard are met within the outer 100 feet of the project.
Stormwater Pollution Prevention Plan comments:
7. Part IV.C.2.d. Provide the estimated pre-construction run-off coefficient.
8. Part IV.C.3.b. Clearly identify on the map areas of soil disturbance Identify on the map areas not to be disturbed
9. Part IV.J.1. Each Operator must sign the SWPPP
Revise the Grading Plan and prepare a SWPPP to address all of these comments and resubmit three copies of the grading plan and three copies of the SWPPP. If you would like to meet with me to discuss any of these comments please call me at (520) 791-5550 ext. 1161 or email me at loren.makus@tucsonaz.gov.

Loren Makus, E.I.T.
Senior Engineering Associate
Engineering Division
Development Services

***********************
May-23-05
Landmark Engineering and Pathways Development have submitted revised plans meeting the above comments and the plans are now approved.
Loren Makus
05/24/2005 HEATHER THRALL ZONING REVIEW Approved
05/25/2005 ANDREW CONNOR NPPO REVIEW Approv-Cond

Final Status

Task End Date Reviewer's Name Type of Review Description
07/19/2005 ANGIE SHOFFSTALL APPROVAL SHELF Completed
07/19/2005 GBONILL1 OUT TO CUSTOMER Completed