Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T05BU00160
Parcel: Unknown

Review Status: Completed

Review Details: GRADING

Permit Number - T05BU00160
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/08/2005 LOREN MAKUS ENGINEERING REVIEW Denied DATE: February 8, 2005
TO: Larry Seal, Desert American Builders.
SUBJECT: Barrio Escalante, Grading Plan Review
REVIEWER: Loren Makus
ACTIVITY NUMBERS: T05BU00160

SUMMARY: The Grading Plan and Stormwater Pollution Prevention Plan were reviewed by Development Services Department Engineering Division. The Grading Plan, Drainage Report and Stormwater Pollution Prevention Plan (SWPPP) were not approved at this time.
Grading Plan comments:
1. As indicated in the tentative plat review comments, this subdivision requires a grading permit. Provide a grading permit submittal for the whole project. Provide a complete description of the extent of the work including the area to be graded, the total cut and fill and the limits of grading.
2. The Grading Plan does not match the approved tentative plat. The approved tentative plat has 46 lots and two retention/detention basins and the submitted grading plan has one basin and 47 lots. Revise the grading plan to be consistent with the approved tentative plat.
3. Clarify the Sheet numbering. Each sheet is numbered as "Sheet 2 of 2."
4. Clearly indicate the limits of grading.
5. Submit a drainage report for the grading plan. The drainage report should discuss the sizing for each drainage structure. Provide results of percolation tests showing that the basins will dispose of the retained volumes within twelve hours.
6. Provide construction details for each drainage structure including each basin, each inlet and outlet structure, and each sidewalk scupper.
7. Provide general dimensions for each basin on the grading plan.
8. Provide construction details and cross sections for the new street.
9. Provide details for the wall openings and show that they meet the requirements of the drainage report. Show the location and size to demonstrate that they have the capacity to receive the discharge.
Stormwater Pollution Prevention Plan comments:
10. Provide a complete Stormwater Pollution Prevention Plan. Complete the Construction SWPPP Checklist and return it with the resubmittal. In the checklist, specifically identify where each requirement has been met.

Revise the Site Plan, Grading Plan, Drainage Report and the SWPPP to address all of these comments and resubmit three copies of the grading plan and two copies of the SWPPP. If you would like to meet with me to discuss any of these comments please call me at (520) 791-5550 ext. 1161 or email me at loren.makus@tucsonaz.gov.

Loren Makus, E.I.T.
Senior Engineering Associate
Engineering Division
Development Services
02/11/2005 ANDREW CONNOR NPPO REVIEW Denied Submit landscape plan included in approved tentative to continue review.
03/01/2005 DAVID RIVERA ZONING REVIEW Denied 03/01/05

Development Services Department
Zoning Review Section

David Rivera
Principal Planner

Comments:

1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed.

2. Zoning could not verify that the grading plan was in compliance with the approved site plan or development plan. Please submit two copies of the approved and stamped site/development, landscape, and NPPO plans with the next grading plan submittal.

3. Zoning will re-review the grading plan on the next submittal to insure compliance with the CDRC approved and stamped tentative plat. Additional comments may be forthcoming.

4. The grading plan does not match the approved tentative plat. Please revise the grading plan to match the tentative plat as approved by CDRC. If the grading plan reflects the actual development propsed for this site a revised, reviewed, approved and re-stamped tentative plat is required.

Final Status

Task End Date Reviewer's Name Type of Review Description
03/02/2005 TAMI ACHONG OUT TO CUSTOMER Completed
03/02/2005 ANGIE SHOFFSTALL REJECT SHELF Completed