Permit Number: T05BU00083
Parcel: 14108521C

Review Status: Completed

Review Details: GRADING

Permit Number - T05BU00083
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/07/2005 PAUL MACHADO ENGINEERING REVIEW Denied To: Jim Watson DATE: February 8, 2005
Architect
3026 N. Country Club Road
Tucson, Arizona 85716

SUBJECT:6992 N. Centry Park Drive, Building No.5, Phase 5
Grading Plan T05BU00083 (First Review)
T15S, R15E, Section 18

RESUBMITTAL REQUIRED: Grading Plan.

Grading Plan:

1. Please include a response letter to the comments along with the corrected copies of the GP.
2. The Grading plan cannot be approved prior to the approval of the Site plan.
3. Show refuse container location, size, and access thereto fully dimensioned per D.S. 2-02.2.1.32 and D.S. 6-01.0. A Include a refuse enclosure detail. The call out for the "10'x10' clr. refuse area" does not ensure a 10' post to post clear area. Obtain permission from John Clark, Environmental Services @ 791-5543 x1136, for the placement of the dumpster.
4. Where is keynote 18 on sheet G/2 used? Show the limits of the 100-year floodplain on the plans.
5. Add to general notes: "All grading shall conform to chapter 11.0 of the COT Development Standards".
6. Is keynote 5 of the general notes on sheet G/3 correct? If not, remove the note.
7. Add note: "Depress all landscaped areas a maximum of 6" for water harvesting"
8. Show cross section with transverse and longitudinal slopes where proposed pavement meets the existing pavement.
9. Please show the proposed roof drainage patterns, 100% of the 10-year flow must be conveyed under the sidewalks. Please provide supporting calculations to demonstrate compliance with D.S. 3-01.4.4. If the location(s) of the roof scuppers have not yet been decided, add a general note indicating sidewalk scuppers (per COT/SD) will be used when the roof scuppers locations have been designed.
10. Call out surface paving material.
11. Curb and Gutter elevation include drainage flow with percent slope.
12. Show details of all surface materials.
13. A permit or a private improvement agreement will be necessary for any work performed within the Right-of-way. Contact Permits and Codes at (520) 791-5100 for permit information.
14. List the area of disturbance on the plans.


Drainage Statement:
1. The Drainage Statement has been accepted by engineering.

Stormwater pollution prevention plan:

1. Previously accepted Stormwater pollution prevention plan for the all phases of the project, must be available for review, at job site at all times.


If you have any questions, I can be reached at 791-5550 x1193 or Paul.Machado@tucsonaz.gov
Paul P. Machado
Senior Engineering Associate
City of Tucson/Development Services Department
201 N. Stone Avenue
P.O. Box 27210
Tucson, Arizona 85726-7210
(520) 791-5550 x1193 office
(520) 879-8010 fax
C:/6992 E. Centry Park Dr. Grading
02/09/2005 ANDREW CONNOR NPPO REVIEW Denied Site plan approval is necessary to continue this review.
02/25/2005 DAVID RIVERA ZONING REVIEW Denied Development Services Department
Zoning Review Section

David Rivera
Principal Planner

Comments:

1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed.

2. Zoning could not verify that the grading plan was in compliance with the approved site plan or development plan. Please submit two copies of the approved and stamped site/development, landscape, and NPPO plans with the next grading plan submittal.

3. Zoning will re-review the grading plan on the next submittal to insure compliance with the approved site/development plan. Additional comments may be forthcoming.

Final Status

Task End Date Reviewer's Name Type of Review Description
03/02/2005 TAMI ACHONG OUT TO CUSTOMER Completed
03/02/2005 ANGIE SHOFFSTALL REJECT SHELF Completed