Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - SITE ALL
Permit Number - T04OT01125
Review Name: RESUBMITTAL - SITE ALL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/11/2005 | PETER MCLAUGHLIN | ZONING | REVIEW | Denied | SITE PLAN TRANSMITTAL TO: Kevin Palmer -The Architecture Company 2625 N. Silverbell Road Tucson, AZ 85745 (520) 622-4506 FROM: Peter McLaughlin Senior Planner FOR: Patricia Gehlen Principal Planner Development Services Dept. PROJECT: T04CM02544 Desert Institute For Healing Arts 639 N. 6th Avenue Site Plan Review (2nd review) TRANSMITTAL: January 11, 2005 COMMENTS: Please attach a response letter with the next submittal, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. It is acknowledged in response comment #4 and in the vehicle parking calculation that there is not sufficient parking provided on site for the proposed educational-instructional school use. A Board of Adjustment Variance is required for the parking deficit. State the variance case number, date of approval, what variances were approved for and conditions of approval on the site plan. In addition, provide a copy of the variance approval document to the Zoning Review Section upon resubmittal. DS 2-02.2.1.A.3 DS 2-02.2.1.A.38 2. It is acknowledged in response comment #12 and in the calculations that no loading zone is to be provided. A Board of Adjustment variance application must be approved. See comment 1 regarding BOA variance requirements. DS 2-02.2.2.A.5 If you have any questions about this transmittal, please call Peter McLaughlin, (520) 791-5608. |
01/11/2005 | PETER MCLAUGHLIN | ZONING HC SITE | REVIEW | Approved | |
12/06/2004 | JIM EGAN | FIRE | REVIEW | Approved | |
12/15/2004 | ANDREW CONNOR | NPPO | REVIEW | Approved | |
12/15/2004 | Andrew Connor | LANDSCAPE | REVIEW | Denied | The following comments apply to 639 N. 6th Ave: 1. Additional Street landscape 10-ft. landscape border is required along Ferro Ave per LUC 3.7.2.4. 2. One (1) canopy tree must be provided for every thirty-three (33) linear feet of landscape border per LUC 3.7.2.4 3. Fifty (50) percent or more of the street landscape border area must have shrubs and vegetative ground cover per LUC 3.7.2.4 4. 20% of shrubs in landscape border are required to be 5 gallon size DS 2-06.3.5.F 5. Indicate square footage of all landscaped areas and calculation of the percentage of vegetative coverage per DS 2-07.2.2.2.g 6. A 6' screen for outdoor storage is required for adjacent commercial property to the south LUC Table 3.7.2-I 7. Provide a 30" continuous screen for vehicle use areas along 4th. St and Ferro Ave. per LUC Table 3.7.2-1 8. Include in general note: Area between sidewalk and curb shall be treated with ground cover such as decomposed granite to help reduce dust pollution per LUC 3.7.2.7 9. Landscape plan shall include irrigation specification design and layout per DS 2-07.5.4.A & DS 2-07.5.4.B including source of irrigation, sleeves for driveways and sidewalks, locations of valves, low-flow bubblers or drip irrigation. |
12/15/2004 | BLANCA ESPINO | ENGINEERING | REVIEW | Denied | Site Plan 1. Recyclable pick-up can be discontinued. Commercial and residential establishments are required to have refuse containers regardless if public or private. Indicate refuse container location, size and access thereto fully dimensioned. D.S. 2-02.32 Demonstrate vehicle maneuverability fully dimensioned. Indicate a refuse enclosure detail as per D.S. 6-01.4.2 Contact John Clark of Environmental Services @ 791-3175 ext. 1136 to reach an agreement that does not meet Development Standards 6-01 and to obtain a DSMR. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
01/21/2005 | TAMI ACHONG | OUT TO CUSTOMER | Completed |
01/21/2005 | TAMI ACHONG | REJECT SHELF | Completed |