04/23/2004 JIM EGAN FIRE REVIEW Denied Fire Lane signs required as noted on plan.
04/23/2004 PATRICIA GEHLEN HANDICAP-SITE REVIEW Denied see zoning comments
04/23/2004 PATRICIA GEHLEN LANDSCAPE REVIEW Denied Zoning
4/22/2004
See Zoning comments
04/23/2004 PATRICIA GEHLEN NPPO REVIEW Passed
04/23/2004 PATRICIA GEHLEN ZONING REVIEW Denied Zoning
4/22/2004
1) The loading zone in the south west corner of the site must be removed. It does not meet minimum code requirements and encroaches into the required PAAL in that area,
2) All dumpster which are not in the orginal locations, as depicted on the development plan recorded in bk 6 pg 92 must be fully dimensioned, screened, and may not interfere in other required uses of the site,
3) Show all awnings, fully dimensioned, on the site plan,
4) The new patio areas around buildings A and C may not use the MS&R reduction per the last approved site plan because they are new square footage. Revise calculations as required,
5) Since additional parking is provided (since the development plan detailed above) those spaces must be fully dimensioned ( There appears to be 10 additional spaces),
6) The two new handi-cap spaces must be fully dimensioned, including signage and access requirements, on the site plan,
7) Provide a landscape plan which demonstrates compliance with the landscape requirements listed on the recoreded development plan listed above. The islands in the parking lot may not be removed if trees are need to meet the minimum Gateway requirements listed on the plan,
8) The southeast corner of building A does not match that shown on the recorded dp. Please explain,
9) Demonstrate that the Peguins outdoor patio area does not interfer with the 4 foot sidewalk around the building,
10) Provide a breakdown of the existing uses by square footage on the site plan,
11) On-site inspections have revealed that the as-built site plan does not match what is going on on the site. Revise as required.
04/23/2004 JIM TATE ENGINEERING REVIEW Denied DATE: April 23, 2004
ACTIVITY NUMBER: T04OT00192
PROJECT NAME:
PROJECT ADDRESS: 3175 N. Campbell
PROJECT REVIEWER: James C. Tate, P.E., CFM

The following items must be revised or added to the Site Plan. Please include a response letter with the next submittal that states how all comments have been addressed.

Resubmittal Required: Site Plan

SITE PLAN COMMENTS

1. A Flood Use Permit is required prior to Site Plan approval.

2. All dumpster which are not in the orginal locations must be fully dimensioned, screened, and may not interfere in other required uses of the site. Access to the dumpsters must comply with DS 6-01. Contact John Clark, 791-3175 for approval of dumpster locations.

Final Status

Task End Date Reviewer's Name Type of Review Description
07/01/2004 BETH GRANT OUT TO CUSTOMER Completed