Permit Review Detail
Review Status: Completed
Review Details: ELECTRICAL
Permit Number - T04EL00051
Review Name: ELECTRICAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/16/2004 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | DENIED 1/16/04 TO4EL00051 1. Identify whether new service is to be single phase, or three phase. 2. Depict the grounding system, sizing all components. 3. Clarify whether the new service is to be overhead, or underground. 4. Show TEP available fault current. 5. Provide fault calculations for all relevant parts of the system. 6. Specify fault current rating of all new equipment. 7. Feeder to new Panel does not have overcurrent protection. Please provide, and size per Code. 8. Provide panel schedule for new panel, and load calculations. 9. Demolition indicates the removal of two meters. If the intent is to power any of the related equipment from the new service and panel, provide a full design for how any conduit/conductor is to be intercepted/replaced. |