Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T04CM05549
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/22/2004 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
| 12/22/2004 | PETER MCLAUGHLIN | ZONING | REVIEW | Approved | |
| 12/23/2004 | JIM EGAN | FIRE | REVIEW | Approved | |
| 12/27/2004 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Needs Review | |
| 12/27/2004 | ANY | BUILDING-COMMERCIAL | REVIEW | Denied | .. T04CM05549 .. 2500 N SILVERBELL ROAD .. DGL .. S1. Provide completed Code Review Checklist. S2. Provide project valuation. S3. Provide site plan showing property lines, all buildings and location of tenant space. S4. Show occupancy of adjacent tenants per 2003 International Building Code. S5. Show conformance with current codes including 2003 IBC. S6. Show toilet room conforms to 2003 ANSI A117.1 Edition , provide elevations, details and dimensions on drawings. S7. Provide structural calculations and details for support of new mechanical unit on the roof and kitchen hood/s. Questions? Call Douglas Laakso Structural Plans Examiner for the City of Tucson Development Services Department at (520) 791-5550 x1111 |
| 12/27/2004 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 12/27/2004 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide calculations to show that the facility has adequate ventilation per Section 403, IMC 2000. 2. Revise the ventilation for the restroom to comply with Sections 403.2.1.(3), 403.2.2, and 403.3, IMC 2000. 3. Show that the proposed hood and exhaust duct meet the requirements of Section 505, IMC 2000. 4. Provide details and structural calculations to show that the hood is supported per Section 507.6, IMC 2000. 5. Provide structural calculations to show that the new roof top mechanical units (RTU-1, RTU-2) are adequately supported. Reference Section 302.1, IMC 2000. 6. Show the size, type, rise, and termination of the water heater flue. Reference Chapter 5, UPC 1994. 7. Show that there is adequate combustion air for the water heater. Reference Section 507, UPC 1994, as amended by the State of Arizona. 8. Show that the intake for the make-up air unit is 10 feet from from any exhaust source. |
| 12/28/2004 | CAGUILA1 | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review | |
| 12/28/2004 | GERRY KOZIOL | WWM | REVIEW | Approved |