Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T04CM05480
Review Name: COMMERCIAL NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/04/2005 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. If the two mirror-image spaces are to be used for separate tenants, obtain a second address and activity number for the second tenant space. 2. Provide energy code compliance calculations. Reference Section 101.2, International Energy Conservation Code 2000. 3. Show the size, routing, and termination of the condensate drains from the fan coil units. Reference Section 307.2, IMC 2000 and Section 807.2, UPC 1994. 4. Provide calculations demonstrating adequate ventilation for the offices. Reference Section 401, IMC 2000. |
| 01/04/2005 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Clarify how water is being provided to the east half of the building. Reference Section 103.2.3, UPC 1994. 2. Revise the site drawing to show the location and size of both the water meter and the reduced pressure backflow preventer assembly. Reference Section 103.2.3, UPC 1994. 3. Provide water supply isometrics. Reference Section 103.2.3, UPC 1994. 4. Provide the minimum plumbing facilities required by Table 2902.1, IBC 2003, for business occupancy. 5. Provide fixture descriptions for all plumbing fixtures. Reference Section 103.2.3, UPC 1994. 6. Specify the materials to be used for the water supply piping. Reference Section 103.2.3, UPC 1994. 7. Provide equipment data for the water heater. Reference Section 103.2.3, UPC 1994. 8. Provide access and working space for water heater. Reference Section 511.0, UPC 1994. 9. All storage-type water heaters require a listed expansion tank. Please show expansion tanks on plans. Reference Section 608.3, UPC 1994 with AZ State amendments. 10. If the specified water heater is not supplied with integral heat traps, provide heat traps on the supply and discharge piping. Reference Section 804.4, IECC 2000. 11. Provide ½" insulation on the first eight feet of supply and discharge piping for the water heater. Reference Section 804.5, IECC 2000. 12. Relocate the water shut off valve to be accessible at all times. Reference Section 605.3, UPC 1994. 13. Provide water pressure and water pipe sizing calculations. Reference Section 610.4, UPC 1994. 14. Include all fixtures (e.g. hose bibbs) and the water requirements of the HVAC equipment when calculating the total demand and determining pipe sizes. Reference Section 610.1, UPC 1994. |
| 01/04/2005 | Gerry Koziol | WWM | REVIEW | Approved | |
| 01/04/2005 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 01/07/2005 | PETER MCLAUGHLIN | ZONING | REVIEW | Denied | Site Plan approval required. |
| 01/11/2005 | Linda Buczynski | ELECTRICAL-COMMERCIAL | REVIEW | Denied | TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1106 OR EMAIL AT Linda.Buczynski@tucsonaz.gov IF YOU CARE TO DISCUSS. 1. Registrant shall date and sign seal. 2. If the two mirror-image spaces are to be used for separate tenants, obtain a second address and activity number for the second tenant space. 3. Provide energy code compliance calculations per IECC 2000 for lighting power budget. 4. Provide disconnect for Water Heater per NEC 422 Part III, or justify otherwise. 5. According to Power Plan, the Heat Pump is on Panel A2. No such panel on this project. 6. Sheet 12 calls out for AC-1 and AC-2 as 115V. The equipment is 240V on electrical plans. Coordinate with Mechanical and clarify. 7. Provide a disconnect switch for the HP, or justify otherwise. 8. Grounding Electrode conductor is mislabeled as feeder on single Line Diagram. 9. Change reference from "1999" NEC to "2002." 10. NEC article referenced on SLD is in the 1999 format. Clarify per 2002 intent. 11. Provide TEP available fault current. 12. Provide fault calculations to demonstrate proper rating of equipment. |
| 01/24/2005 | Christy Foreman | BUILDING-COMMERCIAL | REVIEW | Denied | CITY OF TUCSON DEVELOPMENT SERVICES STRUCTURAL REVIEW COMMENTS DATE: 1/28/05 ACTIVITY NUMBER: T04CM05480 PROJECT NAME: OFFICE / WAREHOUSE PROJECT ADDRESS: 2140 E. WINSETT ST. ARCHITECT / ENGINEER: CHAUNCY MEYER PROJECT REVIEWER: CHRISTY FOREMAN TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1108 OR EMAIL AT CFOREMA1@CI.TUCSON.AZ.US IF YOU CARE TO DISCUSS. STRUCTURAL COMMENTS 1) DESIGN CODE SHOULD BE 2003 IBC PER CITY OF TUCSON ADOPTION OF 2003 IBC 9/2004. 2) DETAIL 22 CLARIFY TYPE'a' NOT USED , SEE DETAIL #206. 3) PLEASE DELETE DETAILS THAT DO NOT PERTAIN TO THIS PROJECT. 4) WHERE IS CMU WALL #1 ON STRUCTURAL CALCULATIONS SHT. #7 LOCATED ON SITE PLAN? 5) JUSTIFY ROOF FRAMING MEMBERS W/ CALCULATIONS. SEE GLULAM BEAM AND JOISTS. ARCHITECTURAL COMMENTS 1) ACCESSIBILITY FROM HANDICAP PARKING TO CURB / SIDEWALK @ WEST TENANT SPACE SECTION IBC 1003.5. 2) ACCESSIBILITY TO ENTRY DOORS - SEE MANEUVERING CLEARANCE @ RECESSED DOORS 404.2.3.4. ANSI 117.1 2003. 3) IBC SECTION 1109.2.1.4 LOCATION OF UNISEX BATHROOM SHALL BE LOCATED ON AN ACCESSIBLE ROUTE AND 1104.3 ACCESSIBLE ROUTE SHALL NOT PASS THROUGH A STORAGE ROOM. 4) GRAB BARS IN RESTROOM PER ANSI A117.1 - 2003 SECTION 604.5. 5) OFFICE DOOR EXITING INTO STORAGE SEE 404.2.3 MANEUVERING CLEARANCES AT DOORS ANSI A117.1 - 2003. 6) PROVIDE CLEARANCE FOR ACCESSIBILITY TO TOILET DOOR. DOOR #3 SWINGS INTO CLEARANCE PROVIDED. |
| 01/28/2005 | Matthew Flick | ENGINEERING | REVIEW | Passed | |
| 12/22/2004 | JIM EGAN | FIRE | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 02/02/2005 | TAMI ACHONG | OUT TO CUSTOMER | Completed |
| 02/02/2005 | TAMI ACHONG | REJECT SHELF | Completed |