Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T04CM05330
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/04/2005 | JIM EGAN | FIRE | REVIEW | Approved | |
| 02/07/2005 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide a plumbing plan to show all of the revisions that have been made to the plumbing system. Reference Section 103.2.3, UPC 1994. |
| 02/07/2005 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 02/07/2005 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Show any modifications that have been made to the mechanical systems. 2. Provide calculations to show that the ventilation for the space conforms to Section 401, IMC 2000. |
| 02/14/2005 | BOB SUBA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 02/23/2005 | GERRY KOZIOL | WWM | REVIEW | Passed | |
| 03/03/2005 | CHRISTY FOREMAN | BUILDING-COMMERCIAL | REVIEW | Denied | CITY OF TUCSON DEVELOPMENT SERVICES STRUCTURAL REVIEW COMMENTS DATE: 3/1/05 ACTIVITY NUMBER: T04CM05330 & T04CM05559 PROJECT NAME: Exercise Room & Addition Business Office PROJECT ADDRESS: 5353 E 22 ND St. #101 ARCHITECT / ENGINEER: Antonio Romano PROJECT REVIEWER: Christy Foreman TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1108 OR EMAIL AT CFOREMA1@CI.TUCSON.AZ.US IF YOU CARE TO DISCUSS. 1) Need to have a complete site plan showing all buildings. Locate on site the building that is being remodeled. Dimensions from other buildings. Justify per section 302.3.2. 2) Separated use 2 hour separation between B and R2 use. Please clarify / locate and provide wall section. 3) Exercise room A-3 use? See section 302.2.1. Please clarify / justify. 4) Separated use see table 302.3.2, 2 hr. fire separation required between a B use and R2/A3. Please clarify / justify. 5) Detail connection of beam 5 1/8" x 12" GLM beam at existing wall. 6) Clarify exercise room 1 story or 2 story structure. Provide calculations accordingly. Beams carrying roof and flooring load? 7) Clarify existing roof framing direction of spans by rafters / floor joists. Existing office and exercise room. 8) Clarify location of shear walls and detail on drawings.. 9) Clarify accessibility Chapter 11 accessible route section 1104. 10) Justify / clarify per section 903.2.7 & 907.2.10.1.2. 11) Structural Engineer need to review and stamp sht. 4/4. |
| 03/10/2005 | PETER MCLAUGHLIN | ZONING | REVIEW | Denied | The approved site plan shows a pedestrian sidewalk connecting to the sidewalk located within the existing right-of-way along 22nd Street. This ped. connection is required and the 5-foot pedestrian refuge shown on the partial site plan must also include a 4-foot sidewalk. Revise plan to show accessible pedestrian route between the new addition and the PAAL. Also, for reference, show the parking spaces as they exist within the vehicle use area shown on the partial site plan. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 03/14/2005 | TAMI ACHONG | OUT TO CUSTOMER | Completed |