Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: CELL TOWER/ANTENNAS
Permit Number - T04CM05254
Review Name: CELL TOWER/ANTENNAS
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/06/2005 | GMOYER1 | PLANNING-CITY HALL | REVIEW | Denied | The following corrections to T04CM05254 are required. 1. Reduce height of Cricket antennas to 75 feet as required by condition b. 2. Show pole diameter as required by condition c. 3. Provide antenna layout in plan view showing dimensions in compliance with condition d. 4. Proposed Cricket icebridge is visible above ground equipment enclosure. Revise in compliance with condition e. 5. Show location of wire ports in compliance with condition f. 6. Include a note or notes addressing painting requirements of condition g. 7. Include a note addressing fence slats required by condition h. 8. Include a note addressing compliance with requirements for substantially opaque access gates required by condition h. If you have any questions, please call Glenn Moyer at 791-4541 extension 1167. The conditions adopted by Mayor and Council November 1, 2004, are provided below for reference: a. A site plan in substantial compliance with the preliminary development plan dated October 4, 2004. b. The tower and antennas shall be no more than 75 feet in height above the existing ground elevation. c. Maximum pole diameter of 24 inches at the base, with a consistent taper to no more than 18 inches at the top. d. A maximum of six antenna panels per array, two (2) per sector. Antennas shall be mounted in pairs, no more than one (1) foot on center. Standoff arms shall be no longer than necessary to achieve a three-foot separation within each sector. e. No external wiring, cabling, icebridges, or footpegs visible above the ground equipment enclosure. f. Wire ports shall be located at the stand off arm connection to the pole. Wire routing from the port to the antenna panel shall be as direct as possible. g. All antennas and mounting hardware shall be painted to match with a low-albedo color paint. h. Ground equipment shall be located within a minimum six foot tall chain link fence with opaque slats, and three (3) stands of barbed wire on top of the chain link. All electrical and mechanical equipment and wiring shall be completely screened from view. Access gates shall be substantially opaque. i. The applicant/owner/operator shall not prohibit collocation by other cellular communications providers on the tower. j. Issuance of a building permit for improvements in substantial compliance with the preliminary development plan and these conditions within 120 days of initial Mayor and Council approval. |
01/18/2005 | Raul Palma | BUILDING-COMMERCIAL | REVIEW | Denied | City of Tucson, Development Services BUILDING AND STRUCTURAL COMMENTS 1) Provide a site plan , not a photograph, showing clearly the location of the tower. The photo. shown is not clear, the 540' is from where to ? The N-S dimenson Is 50' or 75'? Clarify! 2) Provide lateral design as per the 2003 IBC. 3) Provide engineering calc`s for footing or caisson design. |
02/23/2005 | JAY HOGAN | OPERATIONS | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
02/25/2005 | BETH GRANT | OUT TO CUSTOMER | Completed |
02/25/2005 | ANGIE SHOFFSTALL | REJECT SHELF | Completed |