Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T04CM05068
Review Name: COMMERCIAL NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/03/2005 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. The 2000 International Mechanical Code is the relevant code for this project. 2. Provide energy code compliance calculations with supporting heating and cooling load calculations. Reference Sections 101.2 and 503.3, International Energy Conservation Code 2000. 3. Show the maximum certified U-value that will be allowed for the windows used on this building. Reference Section 102.5.2 IECC 2000. 4. Specify the minimum resistance (R-value) of the duct insulation to be used on this project. Reference Section 803.2.8, IECC 2000. 5. Provide structural calculations to verify that the existing roof is capable of supporting the additional dead load due to the installation of the roof top units. Show the weight of the roof-mounted equipment on the drawing. Reference Section 302.1, IMC 2000. 6. Show the routing and termination of the condensate drains. Reference Section 307.2, IMC 2000 and Section 807.2, UPC 1994. 7. Show how the specified heat pumps are capable of maintaining a minimum temperature of 68°F in the interior spaces intended for occupancy on a design heating day (32°F). Reference Section 309.1, IMC 2000. 8. Show that adequate ventilation is being provided to the toilet rooms. Reference Section 403.3, IMC 2000. 9. Provide manufacturer's equipment data along with mechanical and electrical operating information for the exhaust fans. Reference Section 301.6, IMC 2000. 10. Provide listing information for the specified flexible air duct and show that the design and installation comply with the manufacturer's recommendations. Reference Sections 304.1 and 603.5.1, IMC 2000. 11. Show that the design of the clothes dryer exhausts comply with the requirements of Section 504, IMC 2000. 12. Show that the HVAC filters comply with the requirements of Section 605, IMC 2000. 13. Specify the construction and termination of the 10"x 4" ducts located by the ranges. Reference Section 106.3.1, IMC 2000. 14. Coordinate the electrical design with the specified mechanical equipment. |
| 01/03/2005 | Robert Sherry | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide water supply isometrics. Reference Section 103.2.3, UPC 1994. 2. Provide water pressure and water pipe sizing calculations. Reference Section 610.4, UPC 1994. 3. Include all fixtures (e.g. hose bibbs) when calculating the total demand and determining pipe sizes. Reference Section 610.1, UPC 1994. 4. Provide fixture descriptions, including material standards, for all plumbing fixtures. Reference Section 103.2.3, UPC 1994. 5. Complete the waste and vent isometrics. Reference Section 103.2.3, UPC 1994. 6. Provide the rim elevation of the next upstream and the next downstream sanitary manholes and the first floor elevation. Determine the need for a backwater valve per Section 710.1, UPC 1994. 7. Provide upper terminal cleanouts per Section 707.4, UPC 1994. 8. All storage-type water heaters having a device that prevents pressure relief through the building supply require a listed expansion tank. Please show expansion tanks on plans. Reference Section 608.3, UPC 1994 with AZ State amendments. 9. If the specified water heater is not supplied with integral heat traps, provide heat traps on the supply and discharge piping. Reference Section 504.7, IECC 2000. 10. Specify the maximum conductivity of the pipe insulation noted in Note #12. Reference Section 504.5, IECC 2000. 11. Provide showerheads that comply with Section 504.6.1, IECC 2000. |
| 01/03/2005 | JIM EGAN | FIRE | REVIEW | Denied | 1. Fire sprinklers required per 2003 IBC Sec. 903.2.7. 2. Minimum one-hour rated fire partitions required for dwelling unit separations per 2003 IBC Sec. 708. |
| 01/03/2005 | ROBERT SHERRY | WATER | REVIEW | Passed | |
| 01/05/2005 | Gerry Koziol | WWM | REVIEW | Denied | needs waste water 5th floor review of par/non-par (Willie Hanson) |
| 01/12/2005 | Linda Buczynski | ELECTRICAL-COMMERCIAL | REVIEW | Denied | TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1106 OR EMAIL AT Linda.Buczynski@tucsonaz.gov IF YOU CARE TO DISCUSS. 1. International Residential Code is applicable to one and two family dwellings. Triplexes and greater are covered by the National Electrical Code, 2002. 2. Please remove the references to Pima County and State of Arizona. The Authority Having jurisdiction in the City of Tucson. 3. Minimum font size is 10 point, which is a little over 1/8". Please enlarge as necessary. 4. Please specify that receptacles serving countertops are to be GFI. 5. Bathroom branch circuit shall have no other outlets per NEC 210.11 (C) (3). Ckt 16 has not only the bathroom branch circuit but also the exterior. 6. Please specify that the branch circuits which serve the bedroom outlets be AFCI. Reference NEC 210.12 (B). 7. Specify the electrical rating and number of poles of the Heat Pump Disconnect. 8. Mechanical specifies MOCP of 25 for the Rooftop HP. Please provide such protection. 9. Provide power requirements for the Exhaust Fan on Mechanical Plans. 10. Provide lighting fixture cut sheets. 11. Provide lighting fixture schedule. 12. Compliance with the Lighting Ordinance needs to be clear from a reading of the plans. http://www.ci.tucson.az.us/dsd/Codes___Ordinances/Outdoor_Lighting_Code.pdf 13. Provide power requirements for Water Heater on Plumbing Plans. 14. Remove grounding reference to IRC on Service Entrance diagram, and replace with the proper NEC reference. 15. Specify the size of the Grounding Electrode Conductor. 16. Provide TEP Available Fault Current. 17. Provide fault current rating of equipment. 18. Provide fault calculations to demonstrate proper rating of equipment. |
| 01/25/2005 | PETER MCLAUGHLIN | ZONING | REVIEW | Denied | Approved site plan required. |
| 01/31/2005 | DOUG WILLIAMS | ENGINEERING | REVIEW | Denied | Site plan approval required prior to building plan/permit approval. |
| 02/04/2005 | CHRISTY FOREMAN | BUILDING-COMMERCIAL | REVIEW | Denied | CITY OF TUCSON DEVELOPMENT SERVICES STRUCTURAL REVIEW COMMENTS DATE: 2/7/05 ACTIVITY NUMBER: T04CM05068 PROJECT NAME: Triplex PROJECT ADDRESS: 1710 W. Riverview Bl. ARCHITECT / ENGINEER: Joseph A. Hubbard PROJECT REVIEWER: CHRISTY FOREMAN TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1108 OR EMAIL AT CFOREMA1@CI.TUCSON.AZ.US IF YOU CARE TO DISCUSS. 1) General Notes - Note #1, Please conform to IBC 2003 and City of Tucson local amendments. 2) Fire sprinklers required per 2003 IBC see section 903.2.7. 3) Section 708.3 Fire resistance rating for separation of Dwelling units. 4) Clarify / dimension bldg. Setbacks from property lines on all exterior walls on the site plan. 5) Conflict between detail 1/A1 and detail 6/A4. 6) Details called out on framing & foundation plan sht. A3 specifies a sht. S-2. 7) Per table 602, 1 hour fire wall for less than 10 ft. from property lines. 8) Section 704.11.1 parapet construction clarify on wall section/details. 9) Provide fire rated penetration for water line at fire separation. 10) Sht. A2 - footing design based on 1000 psf. Page 1 structural calculations equals 1500 psf. 11) Clarify 1008.1.8.2 Hardware height. 12) Provide parking per IBC 2003 section 1106. 13) Pima county ordinance n0. 2002-66 inclusive home design ord. Not required per the City of Tucson. 14) Clarify / Justify structural design loads per the appropriate code section of the IBC 2003. 15) Provide structural calculations per IBC 2003 and note equations used in the IBC 2003. 16) Clarify HDR-4' = B-1 on sht. 2/13. 17) Provide calculations for option 2x10 @ 16" o.c. 18) Clarify lintels end support minimum of 4". 19) Clarify on drawings and structural calculations location of each specified footing. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 02/10/2005 | TAMI ACHONG | OUT TO CUSTOMER | Completed |
| 02/10/2005 | ANGIE SHOFFSTALL | REJECT SHELF | Completed |