Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T04CM05037
Parcel: 10602186A

Review Status: Stopped

Review Details: COMMERCIAL NEW

Permit Number - T04CM05037
Review Name: COMMERCIAL NEW
Review Status: Stopped
Review Date Reviewer's Name Type of Review Description Status Comments
01/04/2005 Gerry Koziol WWM REVIEW Denied needs 8th floor wastewater credit evaluation
01/06/2005 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Demonstrate energy code compliance using calculations based on the current code. Reference Section 101.3, International Energy Conservation Code 2000.
2. Provide manufacturer's certified U-value for the windows used in the energy conservation code calculations. Reference Section 102.5.2 IECC 2000.
3. Specify the minimum resistance (R-value) of the duct insulation to be used on this project (exterior duct and flexible duct). Reference Section 803.2.8, IECC 2000.
4. Revise the general notes to indicate that the 2000 International Mechanical Code is the relevant code for this project.
5. Provide the installed weight of the rooftop equipment. Reference Section 106.3.1, IMC 2000.
6. Show the size, routing, and termination of the condensate drains. Reference Sections 307.2.1 and 307.2.2, IMC 2000.
01/06/2005 Robert Sherry PLUMBING-COMMERCIAL REVIEW Denied 1. The applicable code for this project is the 1994 Uniform Plumbing Code with Arizona State Amendments.
2. Revise the system design criteria shown on sheet P1 to reflect this project. Confirm the available water pressure with Tucson Water. Reference Section 610.5, UPC 1994.
3. Provide waste and vent isometrics. Reference Section 103.2.3, UPC 1994.
4. Show inverts and slope of building sewer line on drawing. Reference Section 103.2.3, UPC 1994.
5. Provide material standards for all plumbing fixtures being provided for this project. Reference Section 103.2.3, UPC 1994.
6. Provide equipment data for the water heater. Reference Section 103.2.3, UPC 1994.
7. If the specified water heater is not supplied with integral heat traps, provide heat traps on the supply and discharge piping. Reference Section 504.7, IECC 2000.
8. Show that the shower heads comply with the requirements of Section 504.6.1, IECC 2000.
9. Show how the routing of the T&P relief piping through the closet complies with the requirements of Section 608.5, UPC 1994.
10. Include all fixtures and other outlets connected to the same water meter when calculating the total demand and determining pipe sizes. Calculate the water demand using the fixture units shown in Tables 6-3 or A-2. Reference Sections 610.1 and 610.4, UPC 1994.
11. Provide the rim elevation of the next upstream and the next downstream sanitary manholes and the first floor elevation. Determine the need for a backwater valve per Section 710.1, UPC 1994.
12. Modify the trap arm lengths to conform to Table 10-1, UPC 1994 with AZ State amendments.
01/06/2005 ROBERT SHERRY WATER REVIEW Passed
01/11/2005 BLANCA ESPINO ENGINEERING REVIEW Denied assignement by JPV
01/11/2005 BLANCA ESPINO ENGINEERING REVIEW Denied A stamped approved site plan required.
01/18/2005 Linda Buczynski ELECTRICAL-COMMERCIAL REVIEW Denied TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL.

PLEASE CALL AT 791-5550 X1106 OR EMAIL AT Linda.Buczynski@tucsonaz.gov
IF YOU CARE TO DISCUSS.

1. Please modify IBC references in Electrical Notes 1 & 2 from "907.210.1.2" and "907.210.2&3" to read "907.2.10.1.2" and "907.2.10.2&3."
2. Provide AFCI protection for bedroom circuits per NEC 210.12 (B).
3. Power plan appears to have DW and DISP on CT-8, but Range is on CT-6,8. One is single pole, the other is 2-P. Please check and clarify as necessary.
4. Provide power requirements for lighting fixtures. Indicate this on Schedule of Symbols and supply cut sheets. Demonstrate compliance with the Lighting Ordinance.
5. Provide power requirements for Water Heater on plumbing plans.
6. Provide product information sufficient to demonstrate that the Heat Pump and aux. Strip may be run from separate circuits as opposed to a single-point connection.
7. Provide product information sufficient to demonstrate that the Heat Pump and aux. Strip controller prevents them from being run simultaneously. Reference NEC 220.30 (C) (2).
8. Provide Heat Pump Power requirements.
9. Designate that the ceiling fan shall have a light. Reference NEC 210.70 (A) (1).
10. Please put the laundry on a 20A branch circuit. Reference NEC 210.11 (C) (2).
11. Add dishwasher and disposer to load calculations. NEC 220.30 (B) (3), Annex D Example D2 (a).
12. Please clarify that there is to be no N-G bond at the panels in the apartments. NEC 250.24 (A) (5).
13. Specify panel feeder overcurrent protective device.
14. #6 Main Bonding Jumper appears too small per NEC Table 250.66. Identify size of service entrance conductors and re-apply.
15. Provide TEP available fault current.
16. Provide fault current rating of panels and feeder OCPDs.
17. Provide fault calculations for available fault current at the panels.
01/26/2005 DAN CASTRO ZONING REVIEW Denied Zoning Review may not approve the building plans until the site plan has been approved by all sections.
01/28/2005 Christy Foreman BUILDING-COMMERCIAL REVIEW Denied CITY OF TUCSON DEVELOPMENT SERVICES
STRUCTURAL REVIEW COMMENTS

DATE: 1/31/05
ACTIVITY NUMBER: T04CM05037
PROJECT NAME: TRIPLEX
PROJECT ADDRESS: 166 E. PASTIME RD. , 1-3
ARCHITECT / ENGINEER: STEPHEN ROBINSON
PROJECT REVIEWER: CHRISTY FOREMAN



TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL.

PLEASE CALL AT 791-5550 X1108 OR EMAIL AT CFOREMA1@CI.TUCSON.AZ.US IF YOU CARE TO DISCUSS.

1) Provide code analysis data sheet.
2) Lateral analysis missing.
3) IBC 2003 should be used for code justification and analysis. Live loads , dead loads, etc.
4) Sht. A1 note 8 architectural plan keynotes refers to IRC , please provide seperation per IBC section 708.
5) Fire protection requirements see IBC - Table 601, Table 602, Section 705, Section 706, and Section708.
6) Section 903.2.7 Group R An automatic sprinkler system installed in accordance with section 903.3 shall be provided throughout all buildings with a group R fire area.
7) Section 1405 installation of wall coverings, clarify meets table 1405.2 for stucco wall covering.
8) Specify section 907.9.1.4 audible alarm with capability to support visible alarm in accordance with ICC A117.1 ANSI standards.
9) Specify 1008 locks and latches.
10) Hardware height 1008.1.8.2
11) Accessibility requirements see Chapt. 11, IBC
12/27/2004 JIM EGAN FIRE REVIEW Denied Fire sprinklers required. Provide fire sprinkler system design criteria on plans.

Final Status

Task End Date Reviewer's Name Type of Review Description
02/01/2005 SUE REEVES REJECT SHELF Stop
12/23/2004 ANY OUT TO CUSTOMER Stopped