Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T04CM05036
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/17/2004 | Jim Egan | FIRE | REVIEW | Approved | |
11/18/2004 | BLANCA ESPINO | ENGINEERING | REVIEW | Denied | Approved Site Plan required. |
11/30/2004 | Robert Sherry | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide calculations to show that the specified canales are capable of handling the design rain runoff and providing overflow for the roof per Section D1.1, UPC 1994. 2. Provide information to show that the strainer for the specified overflow drains (detail 8/A3) comply with Section D2.1, UPC 1994. 3. Provide calculations showing water supply piping is sized in accordance with Section 610.4, UPC 1994. |
11/30/2004 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide calculations to show that the common ventilation system is sized in accordance with Section 403.3.2, IMC 2000. 2. Ventilation for restrooms in public spaces requires a minimum of 75 CFM of mechanical exhaust per water closet or urinal. Reference Table 403.3, IMC 2000. 3. The current energy code is the 2000 International Energy Conservation Code. 4. Provide duct insulation conforming to Section 803.2.8, IECC 2000. |
11/30/2004 | ROBERT SHERRY | WATER | REVIEW | Approved | |
12/03/2004 | Robert Suba | ELECTRICAL-COMMERCIAL | REVIEW | Denied | 1.All circuit loads to be reflected at panel schedules.(several are not accounted for at panel schedules) |
12/03/2004 | Gerry Koziol | WWM | REVIEW | Approved | |
12/17/2004 | PETER MCLAUGHLIN | ZONING | REVIEW | Denied | Approved site plan required prior to building approval. |
12/28/2004 | DOUG LAAKSO | BUILDING-COMMERCIAL | REVIEW | Denied | .. T04CM05036 .. 2480 E RIVER ROAD .. DGL .. 2000 IBC .. 1ST REVIEW .. 1/18/05 S1. Provide readable seal and signature of Registrant on Development/ Tenative Plat drawing #1 of 5. S2. Provide and signature of Registrant on drawing #1 of 2 water distribution system and provide drawing #2. S3. Revise accessible parking space/access aisle to conform to ANSI A117.1-1998 ed Section #502 and Figure #502.2 , ref drawing #4 of 5 of Development/Tenative Plat. S4. Provide readable seal and signature of Structural Engineer on drawings #S1, S2, S3, S4, AND S5. S5. Indicate fire-rated walls , including hourly fire-rating and listing to justify ,provide a copy of the listing on drawings if other than Item Number from IBC Sec 7 Tables ,on architectural site plan #C2. S6. Provide opening protection at exterior wall 3'8" off East property line adjacent to door #2, ref drawings #C2 and A1 per IBC Section #6 and 704. S7. Provide addressing per Pima County Addressing Ordinance. S8. Submit two sets of shop drawings and calculations, stamped and signed by an Arizona Registered engineer, shop drawings shall be reviewed by and bear the approval of the Engineer or Architect of Record prior to submission to the City of Tucson , Development Services Department for approval prior to erection for : 1. Perforated steel awning. 2. Door hardware. 3. Prefabricated roof joists S9. Provide ceiling framing/suspension system details on drawings. S10. Provide an adequate number of grade elevations on site plan to show accessible route slopes and landings comply with IBC section 10 ,11 and ANSI A117.1-1998 ed. S11. Provide toilet room floor plan and wall elevations to locate : clear floor areas required at doors and fixtures, fixtures by dimensions in plan and elevation and required separation between fixtures. S12. Coordinate drawing #A1 and P1 regarding accessible drinking fountain. S13. Clarify service sink on drawing #A1 vs bar sink on drawing #P1. S14. Provide elevations of workroom /kitchen/breakroom to show accessibility per IBC 1108. S15. Provide details of finish materials on drawings for toilet rooms per IBC Section 1209, ref drawing #A1. S16. Provide sill and head details for window wall at entry, window 'c' and glass wall panels, ref drawings #A1, A4 and A7, including connection to structure, per IBC Section #24. S17. Provide specifications for T&G rigid insulation and styrofoam formed cove, ref drawing #A3 and 7/A4, to show conformance with IBC Section 2603 and Section 2604. S18. Provide details of connection and bearing at beams #1 and 2 , explain bearing and resolve apparent structural interference questions, ref drawing S2. S19. Provide lintel bearing details. S20. Provide structural detail addressing column/beam/double truss connection , ref 7/S4 , S2. S21. Provide typical details for partition and furring to structure above and below, with fastener type , size, spacing/number. S22. Dimensionally locate mechanical units on roof from two adjacent roof edges. S23. Provide structural calculation and details for partition wall at conference room, ref drawing A8. S24. Provide Inspection Program as required by the 1997 Uniform Administrative Code as amended and adopted by the City of Tucson, Section 302.5. S25. Special Inspection required for : 1. Structural masonry 2. Expansion anchors 3. Shop welding 4. Field welding Questions? Call Douglas Laakso Structural Plans Examiner for the City of Tucson Development Services Department at (520) 791-5550 x1111. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
01/24/2005 | DELMA ROBEY | OUT TO CUSTOMER | Completed |