Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T04CM04997
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/05/2005 | CHRISTY FOREMAN | BUILDING-COMMERCIAL | REVIEW | Denied | CITY OF TUCSON DEVELOPMENT SERVICES STRUCTURAL REVIEW COMMENTS DATE: 5/03/05 ACTIVITY NUMBER: T04CM04997 PROJECT NAME: TUCSON STORE FIXTURES PROJECT ADDRESS: 504 W. GRANT RD. ARCHITECT / ENGINEER: LARRY WILSON PROJECT REVIEWER: CHRISTY FOREMAN TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1108 OR EMAIL AT CFOREMA1@CI.TUCSON.AZ.US IF YOU CARE TO DISCUSS. 1) Location and framing for roof top units and AC units. Justify metal building has been designed to carry the loads. 2) Must also have handrail per 1009.11-1009.11.7 3) Clarify ceilings of interior offices, bathrooms, break room, shipping and receiving have been designed for loading or signage must be posted stating no top loading of office structures. Please clarify where this note is on drawings. 4) Cannot exit through storage room therefore signage must be posted that doors are not to be used as exits between showroom and warehouse. Sign must say this door is not a exit. |
05/05/2005 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide clearance in front of the water closet in the men's restroom per Section 408.5, UPC 1994. Coordinate sheet A.1 with detail 2/A.6. 2. Show the slope of the gutters. Reference Section D3.4, UPC 1994. 3. Include all fixtures and the water requirements of the HVAC equipment when calculating the total demand and determining the pipe sizes. The minimum fixture unit count for a 3/8" water connection is 2. Resize the water piping as required. Reference Section 610.1, UPC 1994. |
05/05/2005 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Coordinate the placement of AC-1, AC-2, AC-3, and the unit heaters with the structural calculations and the roof-framing plan. Reference Section 302.1, IMC 2000. The locations shown on sheet M1 do not appear to match those shown on sheet E.1 of 12. 2. Show how adequate access is being provided for the equipment located on the roof. Reference Section 306.5, IMC 2000. A fixed ladder was not found on the architectural drawings. |
05/05/2005 | BLANCA ESPINO | ENGINEERING | REVIEW | Approved | |
05/19/2005 | JMORALE1 | ZONING | REVIEW | Needs Review |