Permit Review Detail
Review Status: Completed
Review Details: SITE
Permit Number - T04CM04957
Review Name: SITE
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/15/2004 | Jim Egan | FIRE | REVIEW | Approved | |
| 11/23/2004 | BLANCA ESPINO | ENGINEERING | REVIEW | Approved | |
| 11/24/2004 | ANDREW CONNOR | NPPO | REVIEW | Approved | |
| 11/24/2004 | Andrew Connor | LANDSCAPE | REVIEW | Denied | 1. Landscape plan shall include irrigation layout per DS 2-07.5.4.A & DS 2-07.5.4.B including source of irrigation, sleeves for driveways and sidewalks, locations of valves, low-flow bubblers, sprinkler or drip irrigation. 2. Criteria for turf areas are as follows: Except as provided by Sec. 3.7.2.2.C.4, turf areas are allowed only within the oasis area. Turf areas will be located to mitigate glare and reduce heat near buildings and their openings, including windows and patios, or to serve as an active play area, and if turf is grouped in separately programmed irrigation areas. The water harvesting system or storm water runoff design on the site is integrated with the turf area 3. Sec. 3.7.2.2.C of the LUC allows a portion of the oasis area to be located within the street landscape border, provided: The oasis area within the street landscape border is restricted to bedding plants. 4. Areas where plants are susceptible to injury by vehicular or pedestrian traffic must be protected by appropriate means, such as curbs, bollards, or low walls. Include protection for landscape areas bordering ingress and egress. |
| 12/10/2004 | Daniel Castro | ZONING | REVIEW | Approved | |
| 12/13/2004 | DAN CASTRO | ZONING HC SITE | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 12/30/2004 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |
| 12/30/2004 | ANGIE SHOFFSTALL | REJECT SHELF | Completed |