Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T04CM04888
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/08/2004 | JIM EGAN | FIRE | REVIEW | Approved | |
11/08/2004 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Revise the water fixture units for the clothes washer. Reference Table 6-3 (Public), UPC 1994. 2. Resize the DCW supply to the water heater and to the clothes washer to coordinate with the submitted calculations. 3. Clarify how the standpipe for the clothes washer is to be wet vented with the mop sink. |
11/08/2004 | CHRISTY FOREMAN | BUILDING-COMMERCIAL | REVIEW | Denied | 1) CLARIFY SITE AND RESTROOM MEETS CHAPT 11 ACCESSIBILITY REQUIREMENTS AND ANSI STANDARDS A117.1. OR JUSTIFY WITH BID NUMBERS PER CHAPT 34 THAT 20% COST OF CONSTRUCTION IS BEING SPENT ON MEETING CHAPT. 11 REQUIREMENTS. 2) CLARIFY CHAPT. 16 SECTION 1621.1.2 LATERAL BRACING FOR PARTITIONS. 3)PROVIDE CODE ANALYSIS SHEET AVAILABLE ON CITY OF TUCSON WEBSITE. |
11/08/2004 | ROBERT SHERRY | WATER | REVIEW | Approved | |
11/08/2004 | DAN CASTRO | ZONING | REVIEW | Approved | |
11/08/2004 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Revise the ventilation calculations to comply with Sections 403.3 and 403.3.2, IMC 2000. |
11/08/2004 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T04CM04888 DENIED 11/08/04 1. Complete lighting Fixture Schedule. 2. Existing circuit loads shall be counted with panel load calculations. 3. A119-8 has receptacle load on Power Plan, but none allocated on panel schedule. Pls clarify. 4. Heating Unit 6, on Ckt A119B-1,3, would have 20900 VA. This computes to over 100A. Does not appear that the 50 A Ckt is adequate. Pls clarify. 5. Heating Unit 8, on A119-16,18, only has load on panel schedule on 18. Panel schedule is not set up to document both sides of panel. 6. Same as Comment #5 above for Heating Unit 9. 7. Same as Comment #5 above for Dryer. 8. Check remaining circuits per Comments 5, 6, and 7 above. 9. Provide service load calculations. |
11/08/2004 | PATRICIA GILBERT | ENGINEERING | REVIEW | Approved | |
11/12/2004 | TACHONG1 | WWM | REVIEW | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
11/12/2004 | TAMI ACHONG | OUT TO CUSTOMER | Completed |