| 01/11/2005 | Robert Sherry | PLUMBING-COMMERCIAL | REVIEW | Approved | |
| 01/11/2005 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | The project is not retail occupancy. Revise the submitted ventilation calculations in accordance with Sections 403.3 and 403.3.2, IMC 2000. |
| 01/25/2005 | Linda Buczynski | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 02/01/2005 | Gerry Koziol | WWM | REVIEW | Denied | need to review location/method of connection to public sewer. 6" connection to manhole requires a manhole tap permit.waste water maps & records 5th floor. 740-6606 |
| 02/09/2005 | RAUL PALMA | BUILDING-COMMERCIAL | REVIEW | Approv-Cond | |
| 02/18/2005 | DAVID RIVERA | ZONING | REVIEW | Denied | 2/18/05 Development Services Department Zoning Review Section David Rivera Senior Planner Comments: 1. Zoning has reviewed the building plans but cannot approve them at this time. Zoning will re-review and approve if possible the building plans on the next submittal providing the stamped and approved site plans are included with the building plan package. 2. A site card with DSD approvals by Fire, Zoning, Handi-cap, Engineering, and Landscape/NPPO including the approved development plan stamped for site plan approval and signatures is required before the grading plan can be approved by Zoning. Two copies of the approved development plan, landscape and NPPO plans are to be submitted with the grading plans packet for processing and approval as a site plan. No fees are involved in re-stamping the development/tentative plat plans as an approved site plan. The development plan, may be walked through for stamps and site card sign off. submit the following: two copies of the stamped development plan, landscape and NPPO plans must be included with the grading plans packet processed together for site approval. |