Permit Review Detail
Review Status: Completed
Review Details: OTHER
Permit Number - T04CM04793
Review Name: OTHER
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/03/2004 | PETER MCLAUGHLIN | ZONING | REVIEW | Needs Review | |
| 12/03/2004 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T04CM04793 DENIED 12/03/04 1. Correct to minimum font size of 10 point. 2. Regarding Ckt H-2,4,6, panel schedule indicates future load, but power plan calls for a fused disconnect. Please clarify intent. 3. Provide sizing of grounding electrode conductor at the trailer. 4. Specify grounding electrode at the trailer. 5. Size the grounding electrode conductor at the transformer. 6. Specify the grounding electrode at the transformer. 7. Specify the grounding electrode at the service disconnect. 8. The #6 CU in the conduit between the TEP X'FMR and the meter, and between the meter and the service disconnect, consists of a redundant path and should be deleted. 9. Provide equipment grounding conductor between panel H and the transformer. 10. Provide TEP available fault current. 11. Provide available fault current at all pertinent parts of the system. 12. Provide fault current rating of equipment. 13 Panel L has a 200A MCB according to the panel schedule, but has a 100A MCB according to the line diagram. Please clarify. |
| 12/03/2004 | BLANCA ESPINO | ENGINEERING | REVIEW | Needs Review | |
| 12/06/2004 | EGRANT1 | BUILDING-COMMERCIAL | REVIEW | Needs Review |